ANS/ASME 58.22 - DRAFT 2014
Current
The latest, up-to-date edition.
REQUIREMENTS FOR LOW POWER AND SHUTDOWN PROBABILISTIC RISK ASSESSMENT
Hardcopy , PDF
English
25-03-2015
Foreword
Preparation of Technical Inquiries To The Joint Committee On
Nuclear Risk Management
Committee Rosters
Part 1 - GENERAL REQUIREMENTS FOR AN LPSD PRA AND QLRA
Part 2 - PLANT OPERATING STATE ANALYSIS
Part 3 - REQUIREMENTS FOR INTERNAL EVENTS LPSD PRA
Part 4 - REQUIREMENTS FOR INTERNAL FLOODS FOR LPSD (LIF)
Part 5 - SEISMIC ANALYSIS
Part 6 - REQUIREMENTS FOR SCREENING
AND CONSERVATIVE ANALYSIS OF
OTHER EXTERNAL HAZARDS DURING
LPSD CONDITIONS
Part 7 - HIGH WIND ANALYSIS
Part 8 - EXTERNAL FLOOD ANALYSIS
Part 9 - OTHER EXTERNAL HAZARDS ANALYSIS
Part 10 - LPSD QUANTATIVE RISK ASSESSMENT
FOR A SPECIFIC LPSD Evolution
Part 11 - SHUTDOWN QUALITATIVE RISK
ASSESSMENT
Part 12 - REFERENCES
Provides requirements for Low Power and Shutdown (LPSD) probabilistic risk assessments (PRA) and for LPSD Qualitative Risk Assessments (QLRA), both of which are used to support risk-informed decisions for commercial light water reactor nuclear power plants.
DevelopmentNote |
Jointly published by ASME & ANS. (11/2017)
|
DocumentType |
Draft
|
Pages |
299
|
ProductNote |
This product is unavailable in Ukraine, Russia, Belarus
|
PublisherName |
American Nuclear Society
|
Status |
Current
|
ASME RA-S : 2008 | LEVEL 1/LARGE EARLY RELEASE FREQUENCY PROBABILISTIC RISK ASSESSMENT FOR NUCLEAR POWER PLANT APPLICATIONS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.