• Shopping Cart
    There are no items in your cart

ANS/ASME 58.22 - DRAFT 2014

Current

Current

The latest, up-to-date edition.

REQUIREMENTS FOR LOW POWER AND SHUTDOWN PROBABILISTIC RISK ASSESSMENT

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

25-03-2015

€394.82
Excluding VAT

Foreword
Preparation of Technical Inquiries To The Joint Committee On
Nuclear Risk Management
Committee Rosters
Part 1 - GENERAL REQUIREMENTS FOR AN LPSD PRA AND QLRA
Part 2 - PLANT OPERATING STATE ANALYSIS
Part 3 - REQUIREMENTS FOR INTERNAL EVENTS LPSD PRA
Part 4 - REQUIREMENTS FOR INTERNAL FLOODS FOR LPSD (LIF)
Part 5 - SEISMIC ANALYSIS
Part 6 - REQUIREMENTS FOR SCREENING
         AND CONSERVATIVE ANALYSIS OF
         OTHER EXTERNAL HAZARDS DURING
         LPSD CONDITIONS
Part 7 - HIGH WIND ANALYSIS
Part 8 - EXTERNAL FLOOD ANALYSIS
Part 9 - OTHER EXTERNAL HAZARDS ANALYSIS
Part 10 - LPSD QUANTATIVE RISK ASSESSMENT
          FOR A SPECIFIC LPSD Evolution
Part 11 - SHUTDOWN QUALITATIVE RISK
          ASSESSMENT
Part 12 - REFERENCES

Provides requirements for Low Power and Shutdown (LPSD) probabilistic risk assessments (PRA) and for LPSD Qualitative Risk Assessments (QLRA), both of which are used to support risk-informed decisions for commercial light water reactor nuclear power plants.

DevelopmentNote
Jointly published by ASME & ANS. (11/2017)
DocumentType
Draft
Pages
299
ProductNote
This product is unavailable in Ukraine, Russia, Belarus
PublisherName
American Nuclear Society
Status
Current

ASME RA-S : 2008 LEVEL 1/LARGE EARLY RELEASE FREQUENCY PROBABILISTIC RISK ASSESSMENT FOR NUCLEAR POWER PLANT APPLICATIONS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.