ANSI/ANS-58.8:2019(R2024)
Current
The latest, up-to-date edition.
Time Response Criteria for Manual Actions at Nuclear Power Plants
Hardcopy , PDF
English
04-10-2024
This standard1) establishes criteria and methods for identifying, calculating, validating, tracking, and documenting time requirements for the performance of nuclear power plant time-limited manual actions that are associated with either design-basis events (DBEs) or licensing basis.
| DocumentType |
Standard
|
| Pages |
23
|
| PublisherName |
American Nuclear Society
|
| Status |
Current
|
| Supersedes |
| IEEE 1023-2020 REDLINE | IEEE Recommended Practice for the Application of Human Factors Engineering to Systems, Equipment, and Facilities of Nuclear Power Generating Stations and Other Nuclear Facilities |
| ANS 3.1-2014 | SELECTION, QUALIFICATION, AND TRAINING OF PERSONNEL FOR NUCLEAR POWER PLANTS |
| ANS 58.9-2002(R2015) | SINGLE FAILURE CRITERIA FOR LWR SAFETY-RELATED FLUID SYSTEMS |
| NFPA 805 : 2020 | Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.