API 1115:1994
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
RECOMMENDED PRACTICE ON THE OPERATION OF SOLUTION-MINED UNDERGROUND STORAGE FACILITIES
Hardcopy , PDF
15-02-2021
English
01-01-2007
SECTION 1 - INTRODUCTION
1.1 Scope
1.2 Overview
1.3 Regulatory Requirements
1.4 Referenced Publications
1.5 Definitions
SECTION 2 - CAVERN HYDRAULICS
2.1 General
2.2 Pressure
2.2.1 Casing Seat Pressure
2.2.2 Maximum Allowable Operating Pressure
2.2.3 Minimum Allowable Operating Pressure
2.2.4 Rate of Pressure Change
2.3 Maximum Product Injection Rate
2.4 Maximum Allowable Brine Injection Rate
2.5 Pressure Surges ("Water Hammer")
2.6 Specific Gravity
2.7 Brine Saturation
SECTION 3 - STORED PRODUCT FACILITIES
3.1 Pumps and Compressors
3.2 Product Control
3.3 Product Measurement
3.4 Product Conditioning
3.5 Surface Product Piping
3.6 Tubular Strings
3.7 Changing the Product Stored
3.7.1 General
3.7.2 Potential Problems Areas and Solutions
SECTION 4 - BRINE FACILITIES
4.1 Salinity
4.2 Brine Sources
4.3 Brine Storage Pond
4.4 Disposal
4.5 Pumping
4.6 Measurement
4.7 Control
4.8 Product/Brine Separation Systems
SECTION 5 - FRESH WATER FACILITIES
5.1 Source
5.2 Pumping
5.3 Measurement
SECTION 6 - WELLHEAD/HANGING STRING
6.1 General
6.2 Planning
6.3 Safety Considerations
6.4 The Workover
6.5 Additional Tests and/or Safety Devices
6.6 Cavern Protection While Out of Service
SECTION 7 - CAVERN INTEGRITY TESTING AND MISCELLANEOUS SURVEYS
7.1 Mechanical Integrity or Certification Testing
7.1.1 General
7.1.2 Brine Full Hydrostatic Pressure Test
7.1.3 Nitrogen/Brine Interface Test
7.2 Frequency of Testing
7.3 Sonar Caliper Surveys
7.4 Geophysical Logs
7.5 Elevation Surveys
7.6 Records and Reports
7.6.1 Retention
7.6.2 Reporting
SECTION 8 - ENVIRONMENTAL AND REGULATORY CONSIDERATIONS
SECTION 9 - SECURITY
9.1 General
9.2 Area Patrol
9.3 Controlled Access
9.4 Boundary/Perimeter Control
9.5 Security Plans
9.6 Locks
SECTION 10 - EMERGENCY PLANS
10.1 General
10.2 Suggested Contents
10.3 Mutual Aid Organizations
SECTION 11 - SAFETY AND TRAINING
11.1 Safety Engineering Design Criteria
11.1.1 General
11.1.2 Cavern Safety Equipment
11.1.3 Rotating Equipment
11.1.4 Maintenance Access
11.2 Personnel Safety
11.3 Contractor Safety
11.4 Operator Training
SECTION 12 - RECORDS
12.1 General
12.2 Design and Construction Records
12.3 Regulatory Compliance Records
12.4 Maintenance Records
12.4.1 Routine Maintenance
12.4.2 Preventive Maintenance
12.5 Ongoing Operations Records
12.6 Operations Log Book
Gives basic guidance on the operation of solution-mined underground hydrocarbon liquid or liquefied petroleum gas storage facilities. Describes all aspects of solution-mined underground storage operation, including cavern hydraulics, brine facilities, wellhead and hanging strings, and cavern testing.
DocumentType |
Standard
|
Pages |
26
|
ProductNote |
Reconfirmed 1994
|
PublisherName |
American Petroleum Institute
|
Status |
Superseded
|
SupersededBy |
API 5CT : 2012 | CASING AND TUBING |
CFR 49(PTS186-199) : 0 | TRANSPORTATION |
API RP 1114 : 2013 | RECOMMENDED PRACTICE FOR THE DESIGN OF SOLUTION-MINED UNDERGROUND STORAGE FACILITIES |
NFPA 15 : 2017 | WATER SPRAY FIXED SYSTEMS FOR FIRE PROTECTION |
NFPA 13 : 2016 | INSTALLATION OF SPRINKLER SYSTEMS |
API 2220 : 2011 | CONTRACTOR SAFETY PERFORMANCE PROCESS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.