1 Scope
1.1 Purpose
1.2 Contents
1.3 Scope Limitations
1.4 Transportation Systems
1.5 Regulatory Considerations
2 Applicable References
3 Definitions
4 Technical Overview
4.1 Leak Detection Technology
4.2 Selection Consideration
4.3 Commodity Properties
5 Infrastructure Supports for CPM
5.1 Field Instrumentation and Measurement
5.2 Communications
5.3 SCADA
5.4 Data Presentation
5.5 Integration of CPM and SCADA
5.6 Data Historian
6 CPM Operation, Maintenance, and Testing
6.1 CPM Operations
6.2 System Testing
6.3 Operating Issues
6.4 CPM System Data Retention
6.5 Pipeline Controller Training and Retraining
6.6 CPM Documentation
Annex A - Discussion of CPM Thresholds
Annex B - Description of Types of Internal Based CPM Systems
Annex C - Metrics and Other Pertinent Text from API 1155