• API 2TD : 2006

    Current The latest, up-to-date edition.

    GUIDELINES FOR TIE-DOWNS ON OFFSHORE PRODUCTION FACILITIES FOR HURRICANE SEASON

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  01-06-2006

    Publisher:  American Petroleum Institute

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 DRILLING AND WORKOVER DRILLING UNITS
      1.1 Background
      1.2 Philosophy
      1.3 Short-Term Recommendations
      1.4 Intermediate-Term Recommendations
    2 PERMANENT EQUIPMENT AND FACILITIES
      2.1 Background
      2.2 Philosophy/Design Conditions
      2.3 Short-Term Recommendations
      2.4 Intermediate-Term Recommendations

    Abstract - (Show below) - (Hide below)

    Raises the awareness of the need to evaluate the tie-downs in use on offshore production facilities for drilling rigs, permanent equipment, and facilities such as quarters, helidecks, etc.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher American Petroleum Institute
    Status Current

    Standards Referenced By This Book - (Show below) - (Hide below)

    API 2FPS : 2011 PLANNING, DESIGNING, AND CONSTRUCTING FLOATING PRODUCTION SYSTEMS
    API 2A WSD : 2014 PLANNING, DESIGNING, AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN
    API 2SIM : 2014 STRUCTURAL INTEGRITY MANAGEMENT OF FIXED OFFSHORE STRUCTURES
    API 2INT-DG : 2007 INTERIM GUIDANCE FOR DESIGN OF OFFSHORE STRUCTURES FOR HURRICANE CONDITIONS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective