• API 95F : 2007

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Available format(s):  Hardcopy, PDF

    Superseded date:  01-02-2024

    Language(s):  English

    Published date:  01-01-2007

    Publisher:  American Petroleum Institute

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 SCOPE
    2 BASIC CONSIDERATIONS
       2.1 Background
       2.2 Mooring Issues
       2.3 Site-and Well-Specific Data
       2.4 Stacked MODUs
       2.5 Exceptional MODU Mooring Operations
       2.6 Mooring Inspection
    3 MOORING ANALYSIS
       3.1 Mooring Analysis Method
       3.2 Idealized mooring system behavior: robustness check or
            weak point analysis
    4 MOORING DESIGN CRITERIA
       4.1 Existing design criteria
       4.2 Recommended Modifications for Gulf of Mexico MODU Moorings
    5 CONSEQUENCES OF MODU MOORING FAILURE AND RETURN PERIOD
       (RISK ASSESSMENT)
       5.1 Risk
       5.2 Simplified Consequence assessment
       5.3 Risk assessment
       5.4 Atypical modu operations
       5.5 Site Specific and Mooring System Information
       5.6 Metocean Criteria
    6 MOORING SYSTEM IMPROVEMENT
       6.1 Higher Strength Components and Additional Lines
       6.2 Fiber Rope Insert
       6.3 Fiber Rope and Steel Wire Rope Interaction - Strength and
            Fatigue Considerations
    7 ANCHOR SYSTEM CONSIDERATIONS
       7.1 Drag anchor
       7.2 Plate anchor
       7.3 Suction Pile
       7.4 Anchor Holding Capacity and Safety Factors
    8 HURRICANE PREPAREDNESS
       8.1 Preparedness Overview
       8.2 Loop and Eddy Currents
       8.3 MODU Trackers
       8.4 Post-storm Reporting
    9 MOORING INSTALLATION
       9.1 Mooring Installation Plan
       9.2 As-Installed Mooring System Information
       9.3 Post-installation Verification
    10 INDICATIVE GULF OF MEXICO HURRICANE EXTREME ENVIRONMENTS
       10.1 Applicability
       10.2 Tabular Metocean Parameters vs. Return Period
    11 REFERENCES
    APPENDIX I - CONSEQUENCE ASSESSMENT CHECKLIST
    APPENDIX II - Storm Reporting Sheet for Semisubmersible Rig Status
                  Report
    APPENDIX III - MODU Mooring Inspection for Areas of Tropical
                   Cyclone
    Figures
    Tables

    Abstract - (Show below) - (Hide below)

    Provides guidance for design and operation of MODU mooring systems in the Gulf of Mexico for the 2007 hurricane season.

    General Product Information - (Show below) - (Hide below)

    Development Note Superseded by Appendix K of API 2SK. (05/2008)
    Document Type Standard
    Publisher American Petroleum Institute
    Status Superseded
    Superseded By
    Supersedes
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective