API MPM CH14.3.2 : 2016
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
ORIFICE METERING OF NATURAL GAS AND OTHER RELATED HYDROCARBON FLUIDS - CONCENTRIC, SQUARE-EDGED ORIFICE METERS - PART 2: SPECIFICATION AND INSTALLATION REQUIREMENTS
25-02-2021
01-01-2016
1 Scope
2 Normative References
3 Terms, Definitions, and Symbols
4 Orifice Plate Specifications
5 Meter Tube Specifications
6 Installation Requirements
Annex A (informative) - Research Projects and Tests
Conducted Between 1922 and 1999
Annex B (informative) - Orifice Meter Inspection Guidelines
Annex C (normative) - Specific Installation Calibration Test
Annex D (normative) - Flow Conditioner Performance Test
Annex E (normative) - Maximum Allowable Orifice Plate Differential
Pressure
Provides design and installation parameters for measurement of fluid flow using concentric, square-edged, flanged tapped orifice meters.
DevelopmentNote |
Supersedes API 2530 (07/2006) Also numbered as AGA XQ1601. (03/2016)
|
DocumentType |
Standard
|
PublisherName |
American Petroleum Institute
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
API MPM CH20.1 : 1993 : R2011 | MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 20 - ALLOCATION MEASUREMENT - SECTION 1 - ALLOCATION MEASUREMENT |
API MPM CH14.3.3 : 2013 | ORIFICE METERING OF NATURAL GAS AND OTHER RELATED HYDROCARBON FLUIDS - CONCENTRIC, SQUARE-EDGED ORIFICE METERS - PART 3: NATURAL GAS APPLICATIONS |
API MPM CH20.1 : 1993 : R2006 | MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 20 - ALLOCATION MEASUREMENT - SECTION 1 - ALLOCATION MEASUREMENT |
API MPM CH20.1 : 1993 : INC : ADD 1 : 2013 : R201100 | MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 20 - ALLOCATION MEASUREMENT - SECTION 1 - ALLOCATION MEASUREMENT |
API MPMS CH 14.3.1:2012(R2017) | ORIFICE METERING OF NATURAL GAS AND OTHER RELATED HYDROCARBON FLUIDS - CONCENTRIC, SQUARE-EDGED ORIFICE METERS - PART 1: GENERAL EQUATIONS AND UNCERTAINTY GUIDELINES |
API MPM CH22.2 : 2017 | MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 22 - TESTING PROTOCOL - SECTION 2 - DIFFERENTIAL PRESSURE FLOW MEASUREMENT DEVICES |
API MPM CH20.1 : 1993( R2016) | MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 20 - ALLOCATION MEASUREMENT - SECTION 1 - ALLOCATION MEASUREMENT |
API MPM CH14.3.1:2012 | ORIFICE METERING OF NATURAL GAS AND OTHER RELATED HYDROCARBON FLUIDS - CONCENTRIC, SQUARE-EDGED ORIFICE METERS - PART 1: GENERAL EQUATIONS AND UNCERTAINTY GUIDELINES |
API 551 : 2016 | PROCESS MEASUREMENT |
API MPM CH14.3.1 : 2012 : INC : ERR 1 : 2013 | ORIFICE METERING OF NATURAL GAS AND OTHER RELATED HYDROCARBON FLUIDS - CONCENTRIC, SQUARE-EDGED ORIFICE METERS - PART 1: GENERAL EQUATIONS AND UNCERTAINTY GUIDELINES |
API MPM CH20.1 : 1993 | MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 20 - ALLOCATION MEASUREMENT - SECTION 1 - ALLOCATION MEASUREMENT |
AGA XQ1201 : 2012(R2017) | AGA REPORT NO. 3, ORIFICE METERING OF NATURAL GAS - PART 1: GENERAL EQUATIONS AND UNCERTAINTY GUIDELINES |
API 44 : 2003 | RECOMMENDED PRACTICE FOR SAMPLING PETROLEUM RESERVOIR FLUIDS |
PIP PCEFL001 : 2017 | FLOW MEASUREMENT GUIDELINES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.