• Shopping Cart
    There are no items in your cart

API PUBL 1628B : 1996

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

RISK-BASED DECISION MAKING

Withdrawn date

01-07-1996

Published date

01-07-1996

Sorry this product is not available in your region.

SECTION 1 - INTRODUCTION
SECTION 2 - USES OF RISK-BASED DECISION MAKING
SECTION 3 - COMPONENTS OF A RISK ASSESSMENT
SECTION 4 - DETERMINATION OF A TERMINATION POINT
SECTION 5 - OTHER CONSIDERATIONS
APPENDIX A - BIBLIOGRAPHY

Describes the application of a tiered or phased risk-based decision making approach to hydrocarbon-impacted sites.

DevelopmentNote
Can be purchased as a set comprising of API 1628, API 1628A, API 1628B, API 1628C, API 1628D & API 1628E - Enter as API 1628 SET. (03/2004)
DocumentType
Standard
ProductNote
This product is unavailable in Cuba, Iran, North Korea, Syria
PublisherName
American Petroleum Institute
Status
Withdrawn

API 1628 : 1996 A GUIDE TO THE ASSESSMENT AND REMEDIATION OF UNDERGROUND PETROLEUM RELEASES
API 1615 : 2011 INSTALLATION OF UNDERGROUND PETROLEUM STORAGE SYSTEMS
API 1615 REDLINE : 2011 INSTALLATION OF UNDERGROUND PETROLEUM STORAGE SYSTEMS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.