• There are no items in your cart

API RP 85 : 2003(R2013)

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

USE OF SUBSEA WET-GAS FLOWMETERS IN ALLOCATION MEASUREMENT SYSTEMS

Withdrawn date

14-02-2024

Published date

01-10-2013

1 SCOPE
   1.1 Wet Gas Definition and Classifications
   1.2 Liquid Hydrocarbon Measurement
   1.3 Scope Summary
2 REFERENCED PUBLICATIONS
3 DEFINITIONS AND NOMENCLATURE
   3.1 Definitions
   3.2 Nomenclature and Symbols
4 SUBSEA METER CALIBRATION AND TESTING
   4.1 General
   4.2 Testing Requirements
   4.3 Flow Test Facilities
   4.4 Calibration Test Program
   4.5 Calibration Deliverables
5 ALLOCATION METHODOLOGY
   5.1 Introduction
   5.2 Principle
   5.3 Validation of Performance and Applicability
   5.4 Derivation of Allocation Factors and Allocated
       Quantities
   5.5 Application of the Allocation Equations
   5.6 Perspective on Allocation: the Impact of
       Systematic Errors
6 INSTALLATION, OPERABILITY, PHYSICAL REQUIREMENTS
   6.1 Overview
   6.2 Normal Operating Conditions Over Field Life
   6.3 Measurement Uncertainty Expected for Normal
       Operating Conditions
   6.4 Design Considerations
   6.5 Installation Effects on Measurement
   6.6 Additional Testing on Measurement Systems
   6.7 Routine Verification
   6.8 Operation Outside Calibrated Envelope
7 ABNORMAL OPERATIONS
   7.1 Contingency Plan
   7.2 Detection of Abnormality (Normal-Abnormal Boundary
       Definition)
   7.3 Investigation (Verification of Abnormality,
       Identification of Cause)
   7.4 Remedial Action
   7.5 If All Else Fails
8 TEMPLATE FOR WET GAS PERMIT APPLICATION
   8.1 Project Identification
   8.2 Process Description
   8.3 Measurement Devices
   8.4 Pre-installation Meter Test Plans
   8.5 Operability Considerations
9 BIBLIOGRAPHY
APPENDIX A UNCERTAINTY DETERMINATION AND THE APPLICATION
           OF EQUATIONS OF STATE
APPENDIX B EVALUATING UNCERTAINTY
APPENDIX C WORKED EXAMPLE OF UNCERTAINTY-BASED ALLOCATION
APPENDIX D MONTHLY UNCERTAINTY DETERMINATION
APPENDIX E UNCERTAINTY-BASED ALLOCATION-DERIVATION OF
           OPTIMAL FACTORS
APPENDIX F WET GAS METER TECHNOLOGY
Figures

This RP presents a recommended allocation methodology that is technically defensible and mathematically optimized to best fit the application, and that equitably accommodates variances in the uncertainty level between meters in the system

DocumentType
Standard
ProductNote
Reconfirmed 2013 The publisher has 2 year extension on October 18 This product is unavailable in Cuba, Iran, North Korea, Syria
PublisherName
American Petroleum Institute
Status
Withdrawn
Supersedes

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.