API SPEC 8C:2012 INC ERR 2:2020
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Drilling and Production Hoisting Equipment (PSL 1 and PSL 2)
Available format(s)
Hardcopy , PDF
Language(s)
English
Published date
01-11-2020
Publisher
Superseded date
29-07-2025
Superseded by
€152.00
Excluding VAT
This Standard provides requirements for the design, manufacture and testing of hoisting equipment suitable for use in drilling and production operations.
| DocumentType |
Standard
|
| Pages |
0
|
| ProductNote |
THIS STANDARD ALSO REFERS:ASTM A488,MIL -H-6875F This product is unavailable in Cuba, Iran, North Korea, Syria
|
| PublisherName |
American Petroleum Institute
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
| API 8B : 2014 | RECOMMENDED PRACTICE FOR PROCEDURES FOR INSPECTIONS, MAINTENANCE, REPAIR, AND REMANUFACTURE OF HOISTING EQUIPMENT |
| ISO 10012-1:1992 | Quality assurance requirements for measuring equipment — Part 1: Metrological confirmation system for measuring equipment |
Summarise