1.0 INTRODUCTION
1.1 Background
1.2 Purpose of this Document
1.3 Scope of this Document
1.4 Document Organization
1.5 Document Precedence
1.6 Use of Shall in this Document
2.0 GUIDELINES FOR IMPLEMENTATION OF TEST
SPECIFICATIONS AND PROCEDURES
2.1 Test Case Tables
2.2 Test Procedure Tables
2.3 State Transition Test Tables
3.0 PIN PROGRAMMING CONFIGURATIONS
3.1 GAIN Pin Programming Configurations
3.2 MGCU Configuration
4.0 VERIFICATION OF COMMANDS
4.1 Power Control
4.2 Diagnosis (Failure Monitoring)
4.3 Data Transfer
4.4 Network Monitoring
4.5 Pin Programming
5.0 STATE TRANSITIONS
5.1 Definitions
5.2 INIT State Testing
5.3 ERROR State Testing
5.4 WAITING State Testing
5.5 INTERRUPTED State Testing
5.6 STANDBY_OFF State Testing
5.7 STOP/ABORTED State Testing
5.8 FINISHED State Testing
5.9 STANDBY_ON State Testing
5.10 ON State Testing
5.11 MAINTENANCE State Testing
5.12 MGCU General Behavior
5.13 GAIN State Transition Specification Test Case
5.14 MGCU State Transition Specification Test Case
APPENDIX
APPENDIX A - LIST OF ACRONYMS