AS 2518-1992
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Fusion-bonded low-density polyethylene coating for pipes and fittings
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
29-11-2018
English
20-07-1992
Specifies requirements for coating for protection against corrosion, where the coating is not subject to weather exposure (a safe period of 18 months of weather exposure is allowed for to cover an extended storage period prior to installation), and the pipeline operating temperatures are not above +60 degrees Celsius nor below -40 degrees Celsius. Coating thickness for normal and heavy duty for a given range of nominal pipe sizes are tabulated.
Committee |
WS-009
|
DocumentType |
Standard
|
ISBN |
0 7262 7442 9
|
Pages |
13
|
ProductNote |
Withdrawn 29-11-2018.
|
PublisherName |
Standards Australia
|
Status |
Withdrawn
|
Supersedes |
This Standard specifies requirements for fusion-bonded low-density polyethylene coating of pipes and fittings for protection against corrosion. The coating is intended for use on pipes and fittings that are installed in locations not subject to weather exposure, although a safe period of 18 months of weather exposure is allowed for to cover the storage period prior to installation.NOTES:1 Advisory information on methods of determining compliance of a 'lot' with this Standard is given in Appendix A.2 Guidelines to purchasers on requirements that are to be specified by the purchaser and those that are to be or may be agreed upon at the time of enquiry or order are given in Appendix B.3 The attention of purchasers is drawn to the necessity to ascertain the expected weathering period of the coating before installation, and in the likelihood of 18 months being exceeded, to make provision for shielding of the coating from direct sunlight.Polyethylene materials complying with this Standard are intended for application to pipes and fittings where the pipeline operating temperatures are not normally more than +60C nor less than -40C.
First published as AS 2518-1982.
Second edition 1992.
HB 18.44-1991 | Guidelines for third-party certification and accreditation - Guide 44: General rules for ISO or IEC international third-party certification schemes for products |
AS 1627.4-1989 | Metal finishing - Preparation and pretreatment of sufaces - Abrasive blast cleaning |
AS 1145-1989 | Determination of tensile properties of plastics materials |
AS 1327-1972 | Standard environments for conditioning and testing plastics materials |
AS 1627.2-2002 | Metal finishing - Preparation and pretreatment of surfaces Power tool cleaning (Reconfirmed 2017) |
AS 3862-1991 | External fusion-bonded epoxy coating for steel pipes |
AS 1627.4-2005 | Metal finishing - Preparation and pretreatment of surfaces Abrasive blast cleaning of steel (Reconfirmed 2017) |
AS 1579-2001 | Arc-welded steel pipes and fittings for water and wastewater (Reconfirmed 2018) |
AS 1463-1988 | Polyethylene pipe extrusion compounds |
AS 1199-1988 | Sampling procedures and tables for inspection by attributes |
AS 1627.2-1989 | Metal finishing - Preparation and pretreatment of surfaces - Power tool cleaning |
AS 1579-1993 | Arc welded steel pipes and fittings for water and waste water |
AS/NZS 1580.108.1:1994 | Paints and related materials - Methods of test Determination of dry film thickness on metallic substrates - Non-destructive methods (Reconfirmed 2013) |
AS 1399-1990 | Guide to AS 1199 - Sampling procedures and tables for inspection by attributes |
AS 1327-2001 | Plastics - Standard atmospheres for conditioning and testing |
AS 1193-1989 | Plastics - Methods for determining the density and relative density of non-cellular plastics |
AS 3900.1-1987 | Quality management and quality assurance Standards Guidelines for selection and use |
AS 1580.108.1-1980 | Paints and related materials - Methods of test Determination of dry film thickness on iron and steel substrates (permanent magnet instruments) |
AS 2885.1-1997 | Pipelines - Gas and liquid petroleum Design and construction |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.