The purpose of this guide is to give guidance and explanatory comments on the existing procedures for lightning and switching impulse testing of power transformers to supplement the requirements of I E C Publication 76-3: Power Transformers, Part 3: Insulation Levels and Dielectric Tests. The contents of this guide are also generally applicable to the testing of reactors, see I E C Publication 289: Reactors, modifications to power transformer procedures being indicated where required. Information is given on wave-shapes, test circuits including test connections, earthing practices, failure detection methods, test procedures, measuring techniques and interpretation of results. Where applicable, the test techniques are as recommended in I E C Publication 60: High-voltage Test Techniques.