1 - AS 4214.1-1995 GASEOUS FIRE EXTINGUISHING SYSTEMS - GENERAL REQUIREMENTS
4 - PREFACE
5 - CONTENTS
7 - FOREWORD
8 - SECTION 1 SCOPE AND GENERAL
8 - 1.1 SCOPE
8 - 1.2 APPLICATION
8 - 1.3 NEW DESIGNS AND INNOVATIONS
8 - 1.4 REFERENCED DOCUMENTS
9 - 1.5 DEFINITIONS
9 - 1.5.1 Appropriate authority
9 - 1.5.2 Approved and approval
9 - 1.5.3 Automatic
9 - 1.5.4 Containers
9 - 1.5.5 Container discharge valve
9 - 1.5.6 Control device
9 - 1.5.7 Converted systems
9 - 1.5.8 Design concentration
9 - 1.5.9 Directional valve
9 - 1.5.10 Discharge inhibit switch
10 - 1.5.11 Distribution system
10 - 1.5.12 Extinguishant
10 - 1.5.13 Flame extinguishing concentration
10 - 1.5.14 Hazardous concentrations
10 - 1.5.15 Holding time
10 - 1.5.16 Inerting
10 - 1.5.17 Local application system
10 - 1.5.18 Lock-off valve
10 - 1.5.19 Lowest observed adverse effect level (LOAEL)
10 - 1.5.20 Manual
10 - 1.5.21 Monitoring
10 - 1.5.22 No observed adverse effect level (NOAEL)
10 - 1.5.23 Nominal size
10 - 1.5.24 Normally occupied area
10 - 1.5.25 Normally unoccupied area
10 - 1.5.26 Operating device
10 - 1.5.27 Primary release
10 - 1.5.28 Release
11 - 1.5.29 Shall
11 - 1.5.30 Should
11 - 1.5.31 Secondary (slave) release
11 - 1.5.32 Total flooding system
11 - 1.5.33 Listing authority
11 - 1.6 INTERPRETATION OF SPECIFIED LIMITING VALUES
11 - 1.7 USES FOR AND LIMITATIONS OF GASEOUS SYSTEMS
11 - 1.7.1 General
11 - 1.7.2 Uses for gaseous systems
11 - 1.7.3 Limitations of gaseous systems
11 - 1.7.4 Protection of multiple enclosures
13 - SECTION 2 SAFETY REQUIREMENTS
13 - 2.1 SAFETY OF PERSONNEL
13 - 2.2 SAFETY PRECAUTIONS
14 - 2.3 PROTECTION OF OCCUPANTS
14 - 2.4 SAFETY REQUIREMENTS
14 - 2.4.1 General
14 - 2.4.2 Total flooding systems
15 - 2.4.3 Local applications systems
15 - 2.4.4 Installer's responsibility
16 - 2.4.5 Owner's responsibility
16 - 2.4.6 Electrostatic discharge
16 - 2.4.7 Other potential hazards
18 - SECTION 3 SYSTEM DESIGN
18 - 3.1 SPECIFICATIONS, PLANS AND APPROVALS
18 - 3.1.1 Specifications
18 - 3.1.2 Plans
18 - 3.1.3 System calculation approval
18 - 3.1.4 Approval of plans
18 - 3.1.5 Performance and classification requirements
18 - 3.2 APPROVAL OF INSTALLATIONS
18 - 3.3 APPROVAL OF COMPONENTS
19 - 3.4 CONCENTRATION REQUIREMENTS
19 - 3.5 APPLICATION RATE AND DURATION OF DISCHARGE
19 - 3.6 EXTENDED APPLICATION
19 - 3.7 CONCENTRATION, DISTRIBUTION AND HOLDING
19 - 3.8 FLAMMABLE LIQUIDS AND GASES
19 - 3.8.1 Concentration
19 - 3.8.2 Requirements for flame extinguishment
20 - 3.8.3 Flame extinguishing concentrations
20 - 3.8.4 Inerting
20 - 3.9 DEEP-SEATED FIRES
20 - 3.10 TOTAL FLOODING QUANTITY REQUIREMENTS
21 - 3.11 SPECIAL CONDITIONS
21 - 3.12 LOCAL APPLICATION SYSTEMS
21 - 3.13 COMPATIBILITY
21 - 3.15 DEEMED TO SATISFY
22 - SECTION 4 PROTECTED ENCLOSURE REQUIREMENTS
22 - 4.1 UNCLOSABLE OPENINGS
22 - 4.2 VENTILATION AND SERVICES
22 - 4.3 PRESSURE RELIEF VENTING
22 - 4.4 ENCLOSURE STRENGTH AND ALLOWABLE PRESSURE
24 - SECTION 5 SUPPLY
24 - 5.1 QUALITY
24 - 5.2 STORAGE CONTAINERS
24 - 5.3 VALVES
24 - 5.3.1 General
24 - 5.3.2 Isolating valves
24 - 5.3.3 Lock-off valves
24 - 5.3.4 Container discharge valves
24 - 5.4 STORAGE CONTAINER ARRANGEMENT
26 - SECTION 6 DISTRIBUTION SYSTEM
26 - 6.1 GENERAL
26 - 6.2 PIPEWORK
26 - 6.3 INSTALLATION OF PIPEWORK
26 - 6.4 QUALITY CONTROL AND QUALITY ASSURANCE OF PIPEWORK
26 - 6.5 DIRT TRAPS
26 - 6.6 DRAIN TRAPS
26 - 6.7 SAFETY DEVICES
26 - 6.7.1 Pressure-relief device
27 - 6.7.2 Automatic venting
27 - 6.7.3 Safety of personnel
27 - 6.8 NOZZLES
27 - 6.8.1 Nozzle choice and location
28 - 6.8.2 Ceiling tiles
29 - SECTION 7 CONTROL SYSTEMS
29 - 7.1 GENERAL
29 - 7.2 ELECTRICAL CONTROL
29 - 7.3 OPERATING DEVICES
29 - 7.4 CONTROL AND INDICATING EQUIPMENT
30 - 7.5 DISCHARGE CONTROLS
30 - 7.6 LOCAL CONTROL STATION
31 - 7.7 AUDIBLE ALARMS AND VISIBLE WARNING DEVICES
31 - 7.8 MANUAL MECHANICAL RELEASE
31 - 7.9 PNEUMATIC
31 - 7.9.1 General
31 - 7.9.2 Energy source
31 - 7.9.3 Reliability of energy source
31 - 7.10 MECHANICAL
31 - 7.11 TIME DELAY FUNCTION
32 - SECTION 8 MARKING
32 - 8.1 CONTROL AND INDICATING EQUIPMENT (CIE)
32 - 8.2 VISUAL WARNING DEVICES
32 - 8.3 NUMBER OF CONTAINERS AND QUANTITY MARKING
32 - 8.4 IDENTIFICATION AND MARKING OF CONTAINERS
32 - 8.4.1 Identification
32 - 8.4.2 Permanent markings
32 - 8.4.3 Marking
33 - 8.5 LABELLING OF INDICATORS AND CONTROLS
33 - 8.6 IDENTIFICATION OF DISCHARGE NOZZLES
37 - SECTION 9 COMMISSIONING AND ACCEPTANCE TESTING
37 - 9.1 CRITERIA FOR ACCEPTANCE
37 - 9.2 FAILURE
38 - APPENDIX A - COMMISSIONING CHECK LIST