1 - AS 4292.2-2006 RAILWAY SAFETY MANAGEMENT - TRACK, CIVIL AND ELECTRICAL INFRASTRUCTURE
4 - PREFACE
5 - CONTENTS
6 - FOREWORD
7 - SECTION 1 SCOPE AND GENERAL
7 - 1.1 SCOPE
7 - 1.2 APPLICATION
7 - 1.3 REFERENCED DOCUMENTS
8 - 1.4 DEFINITIONS
8 - 1.4.1 Check rails
8 - 1.4.2 Cross level
8 - 1.4.3 Gauge
8 - 1.4.4 Guard rails
8 - 1.4.5 Neutral temperature
8 - 1.4.6 Points and crossings
8 - 1.4.7 Permissible rolling stock outline
8 - 1.4.8 Permissible structure outline
8 - 1.4.9 Shall
8 - 1.4.10 Should
8 - 1.4.11 Superelevation
8 - 1.4.12 Track buckle
8 - 1.4.13 Track geometry
8 - 1.4.14 Twist
9 - 1.4.15 Validation
9 - 1.4.16 Verification
9 - 1.5 FUNCTIONAL AREAS
9 - 1.6 ASSET LIFE CYCLE
10 - 1.7 ADOPTION OF EXISTING PRACTICES
10 - 1.8 HAZARD IDENTIFICATION AND RISK ANALYSIS
10 - 1.9 COMMUNICATION
10 - 1.10 HANDLING OF EXCEPTIONS
12 - SECTION 2 INTERFACE COORDINATION
13 - SECTION 3 DESIGN
13 - 3.1 GENERAL
13 - 3.2 OPERATING PARAMETERS
13 - 3.3 INFRASTRUCTURE ITEMS
14 - 3.4 VERIFICATION AND VALIDATION
15 - SECTION 4 CONSTRUCTION AND IMPLEMENTATION
15 - 4.1 GENERAL
15 - 4.2 INFRASTRUCTURE REQUIREMENTS
15 - 4.3 VERIFICATION AND VALIDATION
16 - SECTION 5 COMMISSIONING
16 - 5.1 GENERAL
16 - 5.2 INSPECTION AND TEST PLAN
17 - SECTION 6 MONITORING AND MAINTENANCE
17 - 6.1 GENERAL
17 - 6.2 MONITORING AND MAINTENANCE REQUIREMENTS
17 - 6.3 TEMPORARY INFRASTRUCTURE RESTRICTIONS
17 - 6.3.1 General requirements
18 - 6.3.2 Factors to be considered
19 - SECTION 7 MODIFICATION
20 - SECTION 8 DECOMMISSIONING AND DISPOSAL
21 - APPENDIX A - ROLLING STOCK AND STRUCTURE CLEARANCES
22 - APPENDIX B - ASSET LIFE CYCLE PHASES-DESCRIPTION AND PROCESS REQUIREMENTS
26 - APPENDIX C - INTERFACES BETWEEN ENGINEERING AND OPERATIONAL FUNCTIONS
30 - APPENDIX D - INFRASTRUCTURE ELEMENTS
30 - D1 GENERAL
30 - D2 SIGHT DISTANCE PROVISION
30 - D2.1 Detailed recommendations
30 - D2.2 Factors to be considered
30 - D3 OPERATIONAL SIGNAGE
30 - D3.1 Detailed recommendations
31 - D3.2 Factors to be considered
31 - D4 STRUCTURE AND ELECTRICAL INFRASTRUCTURE CLEARANCES
31 - D4.1 Detailed recommendations
31 - D4.2 Factors to be considered
31 - D5 TRACK GEOMETRY
31 - D5.1 Detailed design recommendations
32 - D5.2 Detailed recommendations for actual geometry
32 - D5.3 Factors to be considered
32 - D6 STRUCTURES
32 - D6.1 General
32 - D6.2 Other party structures
33 - D7 FLOODING AND STORM DAMAGE MANAGEMENT
33 - D7.1 Detailed recommendations
33 - D7.2 Factors to be considered
33 - D8 EARTHWORKS
33 - D8.1 Detailed recommendations
33 - D8.2 Factors to be considered
34 - D9 RAIL SUPPORT SYSTEMS
34 - D9.1 Ballast
34 - D9.2 Sleepers, bearers and other rail support systems
35 - D9.3 Fastening assemblies
35 - D10 RAIL
35 - D10.1 Detailed recommendations
35 - D10.2 Factors to be considered
36 - D10.3 Welding of rail joints
36 - D11 GUARD RAILS
36 - D12 POINTS AND CROSSINGS
36 - D12.1 Detailed recommendations
36 - D12.2 Factors to be considered
37 - D13 TRACK LATERAL STABILITY
37 - D13.1 Detailed recommendations
37 - D13.2 Factors to be considered
37 - D14 ACCESS CONTROL AND PROTECTION
37 - D14.1 General
38 - D14.2 Protection devices
38 - D15 FIRE PREVENTION AND CONTROL
38 - D15.1 General recommendations
38 - D15.2 Factors to be considered
39 - D16 OPERATION AND CONTROL OF THE ELECTRICAL SYSTEM
39 - D17 ELECTRIC TRACTION SYSTEM CAPACITY AND INTEGRITY
39 - D18 SEPARATION DISTANCES FROM ELECTRICAL EQUIPMENT
40 - D19 WORKING ON LIVE EQUIPMENT
40 - D20 ELECTRICAL SWITCHING AND ISOLATING PROCEDURES
40 - D20.1 Detailed recommendations
40 - D20.2 Factors to be considered
40 - D21 CONTROL OF TOUCH AND STEP POTENTIALS
40 - D21.1 Earthing
40 - D21.2 Bonding and traction return systems
40 - D22 SPATIAL LOCATION OF CONDUCTORS
41 - D23 ELECTRICAL FAULT PROTECTION
41 - D24 ELECTROLYSIS MITIGATION
41 - D25 ELECTRIC TRACTION SYSTEM INTERFERENCE MANAGEMENT
42 - APPENDIX E - MANAGEMENT OF WORK SITES
42 - E1 DETAILED RECOMMENDATIONS
42 - E2 FACTORS TO BE CONSIDERED
43 - APPENDIX F - FREQUENCY OF INSPECTION AND ASSESSMENT
43 - F1 GENERAL
43 - F2 SCHEDULED INSPECTIONS
44 - F3 UNSCHEDULED INSPECTION