AS 60076.1-2005
AvailableSuperseded
An Available Superseded Standard is one, which has been made available for a period of time although it has been formally superseded by another Standard. Its availability is maintained where it is referenced in legislation/regulations or in other Standards and its use should be restricted to where so referenced. No responsibility is taken by SAI Global as to the ongoing technical validity of such a Standard, the responsibility resting with the referencing authority.
Power transformers General (IEC 60076-1, Ed. 2.1 (2000) MOD)
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
English
05-12-2005
Gives technical requirements for single and three-phase power transformers, including auto transformers, but excludes single-phase transformers rated at less than 1 kVA, three-phase transformers rated at less than 5 kVA, and certain special transformers such as instrument, starting, testing and welding transformers, transformers for static converters and those mounted on rolling stock. Includes Australian variations such as commonly used power ratings and preferred methods of cooling, connections in general use, and details regarding connection designation.
Committee |
EL-008
|
DocumentType |
Standard
|
ISBN |
0 7337 7025 8
|
Pages |
59
|
PublisherName |
Standards Australia
|
Status |
AvailableSuperseded
|
SupersededBy | |
Supersedes |
Originated as part of AS C61-1931.
Previous edition AS 2374.1-1997.
Revised and redesignated as AS 60076.1-2005.
AS 60068.3.3-2003 | Environmental testing Guidance - Seismic test methods for equipment |
AS 2374.3.0-1982 | Power transformers Insulation levels and dielectric tests - General requirements |
AS 2558-1982 | Transformers for use on single wire earth return distribution systems |
AS 2374.8-2000 | Power transformers Application guide (Reconfirmed 2016) (Reconfirmed 2024) |
AS 2374.6-1994 | Power transformers Determination of transformer and reactor sound levels |
AS 2374.5-1982 | Power Transformers Ability To Withstand Short-Circuit |
AS 1265-1990 | Bushings for alternating voltages above 1000 V |
AS 2374.7-1997 | Power transformers Loading guide for oil-immersed power transformers |
AS 3953-1996 | Loading guide for dry-type power transformers |
AS 1767.1-1999 | Insulating liquids - Specification for unused mineral insulating oils for transformers and switchgear |
AS/NZS ISO 9001:2000 | Quality management systems - Requirements |
AS 60529-2004 | Degrees of protection provided by enclosures (IP Code) (Reconfirmed 2018) |
AS 2735-1984 | Dry-type power transformers |
AS 2374.2-1997 | Power transformers Temperature rise |
AS 4436-1996 | Guide for the selection of insulators in respect of polluted conditions |
AS/NZS 60076.3:2008 | Power transformers Insulation levels, dielectric tests and external clearances in air (IEC 60076-3, Ed. 2 (2000) MOD) |
AS 60076.11-2006 | Power transformers Dry-type transformers (Reconfirmed 2016) |
AS/NZS 60076.6:2013 | Power transformers Reactors |
AS 62271.202-2008 | High-voltage switchgear and controlgear High-voltage/low-voltage prefabricated substation |
AS 60214.2-2006 | Tap-changers Application guide (Reconfirmed 2016) |
AS 2558-2006 | Transformers for use on single-wire earth-return distribution systems |
AS/NZS 60076.2:2013 | Power transformers Temperature rise for liquid-immersed transformers (IEC 60076-2, Ed. 3.0 (2011) MOD) |
AS/NZS 4871.1:2012 | Electrical equipment for mines and quarries General requirements |
AS/NZS 4871.3:2010 | Electrical equipment for mines and quarries Substations |
AS/NZS 60076.7:2013 | Power transformers Loading guide for oil-immersed power transformers (IEC 60076-7, Ed. 1.0 (2005) MOD) |
AS/NZS 3007:2013 | Electrical equipment in mines and quarries - Surface installations and associated processing plant |
AS/NZS 60076.10:2009 | Power transformers Determination of sound levels (IEC 60076-10, Ed.1 (2001) MOD) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.