AS 4554-2005
|
Gas laundry dryers (Reconfirmed 2016) |
AS 3517-2007
|
Capillary fittings of copper and copper alloy for non-pressure sanitary plumbing applications (Reconfirmed 2018) |
AS 4553-2008
|
Gas space heating appliances |
AS/NZS 3500.4:2015
|
Plumbing and drainage Heated water services |
AS 2118.1:2017
|
Automatic fire sprinkler systems General systems |
AS/NZS 3500.2:2018
|
Plumbing and drainage Sanitary plumbing and drainage |
AS 2896-1998
|
Medical gas systems - Installation and testing of non-flammable medical gas pipeline systems |
AS/NZS 2243.6:2010
|
Safety in laboratories Plant and equipment aspects |
AS/NZS 3992:1998
|
Pressure equipment - Welding and brazing qualification |
AS 1357.1-2004
|
Valves primarily for use in heated water systems - Protection valves |
AS/NZS 2845.1:2010
|
Water supply - Backflow prevention devices Materials, design and performance requirements |
AS 5200.037.2-2008
|
Plumbing and drainage products Flow controllers for use with heated or cold water systems (Reconfirmed 2016) |
AS/NZS 3500.1:2018
|
Plumbing and drainage Water Services |
AS 1410-2003
|
Sterilizers - Steam - Pre-vacuum |
AS/NZS 1554.7:2006
|
Structural steel welding Welding of sheet steel structures |
AS 1796-2001
|
Certification of welders and welding supervisors (Reconfirmed 2016) |
AS 4032.2-2005
|
Water supply - Valves for the control of hot water supply temperatures Tempering valves and end-of-line temperature-actuated devices (Reconfirmed 2015) |
AS/NZS 3500.4:2003
|
Plumbing and drainage Heated water services |
AS/NZS 3500.2:2003
|
Plumbing and drainage Sanitary plumbing and drainage |
AS 2419.1:2017
|
Fire hydrant installations System design, installation and commissioning |
AS 1357.2-2005
|
Valves primarily for use in heated water systems Control valves (Reconfirmed 2015) |
AS 1628-1999
|
Water supply - Metallic gate, globe and non-return valves |
AS/NZS 3500.3:2003
|
Plumbing and drainage Stormwater drainage |
AS 4041-2006
|
Pressure piping (Reconfirmed 2016) |
AS 2067-1984
|
Switchgear assemblies and ancillary equipment for alternating voltages above 1 kV |
AS 2118.9-1995
|
Automatic fire sprinkler systems Piping support and installation (Reconfirmed 2013) |
AS 1687-1991
|
Knapsack spray pumps for firefighting |
AS 2182-1998
|
Sterilizers - Steam - Benchtop |
AS 2243.6-1990
|
Safety in laboratories - Mechanical aspects |
AS 2192-2002
|
Sterilizers - Steam - Downward-displacement |
AS/NZS 3718:2005
|
Water supply - Tap ware (Reconfirmed 2016) |
AS 4809:2017
|
Copper pipe and fittings - Installation and commissioning |
AS/NZS 3500.3:2018
|
Plumbing and drainage Stormwater drainage |
AS/NZS 5601.1:2013
|
Gas installations General installations |
AS 1910-2004
|
Water supply - Float control valves for use in hot and cold water (Reconfirmed 2016) |
AS 4032.4:2014
|
Water supply - Valves for the control of heated water supply temperatures Thermostatically controlled taps for the control of heated water supply temperatures |
AS/NZS 2845.1:1998
|
Water supply - Backflow prevention devices Materials, design and performance requirements |
AS 4551-2008
|
Domestic gas cooking appliances |
AS 2896-2011
|
Medical gas systems - Installation and testing of non-flammable medical gas pipeline systems |
AS 1357.1-2009
|
Valves primarily for use in heated water systems Protection valves |
AS 4643-2007
|
Overhead radiant tube gas heaters |
AS/NZS 3500.4:2018
|
Plumbing and drainage Heated water services |
AS/NZS 5601.1:2010
|
Gas installations General installations |
AS 5200.007-2008
|
Plumbing and drainage products Metal-bodied water hammer arresters |
AS 2118.1-2006
|
Automatic fire sprinkler systems General systems |
AS/NZS 3500.1:2003
|
Plumbing and drainage Water services |
AS/NZS 1167.2:1999
|
Welding and brazing - Filler metals Filler metal for welding |
AS 3688-2005
|
Water supply - Metallic fittings and end connectors |
AS 1589-2001
|
Copper and copper alloy waste fittings (Reconfirmed 2018) |
AS/NZS 3500.3:2015
|
Plumbing and drainage Stormwater drainage |
AS 2419.1-2005
|
Fire hydrant installations System design, installation and commissioning |