This Standard is intended to provide a common framework for Rail Transport Operators (RTOs) to plan and execute the inspection, testing and commissioning of new and altered signalling infrastructure.
The concepts within this Standard are intended to be applied throughout any railway signalling project, both in the context of a railway signalling and control system project, and during the operating life of the system.
This Standard is intended to be applied to railway signalling works and to specify the following –
- the minimum sufficient inspection & testing requirements to assure the safety of the system;
- appropriate test procedures to ensure consistency in testing and results;
- minimum documentation necessary to ensure a comprehensive record of test results, to demonstrate the safety of the system;
- appropriate processes to plan the inspection and testing to ensure that all necessary testing is completed, including unexpected changes and events;
- appropriate processes for managing the testing activities, to ensure that they are completed in a timely manner without waste of resources;
- processes for the orderly handover of commissioned system to the responsible operator;
- processes for ensuring that inspection testing work is performed by persons having the necessary competency and authorisation.
DocumentType |
Standard
|
Pages |
108
|
PublisherName |
Rail Industry Safety and Standards Board
|
Status |
Current
|
First published as AS/RISSB 7717:2016.
AS/RISSB 7720 : 2017 | Signalling Equipment Enclosure and Wiring |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.