• ASHRAE GUIDELINE 0 : 2013

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    THE COMMISSIONING PROCESS

    Available format(s):  Hardcopy, PDF

    Superseded date:  24-07-2019

    Language(s):  English

    Published date:  18-07-2018

    Publisher:  American Society of Heating, Refrigerating & Air Conditioning Engineers

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Purpose
    2 Scope
    3 Utilization
    4 Definitions
    5 Predesign Phase
    6 Design Phase
    7 Construction Phase
    8 Occupancy/Occupation Phase
    Informative Annex A: Guide for Developing Supplementary
                         Technical Guidelines for the
                         Commissioning Process
    Informative Annex B: Commissioning Process Flow Chart
    Informative Annex C: Cost and Benefits of the Commissioning
                         Process
    Informative Annex D: Commissioning Process Documentation Matrix
    Informative Annex E: Commissioning Process Request for
                         Qualifications
    Informative Annex F: Roles and Responsibilities
    Informative Annex G: Commissioning Plan
    Informative Annex H: Acceptance Plan
    Informative Annex I: Owner's Project Requirements Workshop Guidance
    Informative Annex J: Owner's Project Requirements
    Informative Annex K: Basis of Design (BoD)
    Informative Annex L: Specifications
    Informative Annex M: Construction Checklists
    Informative Annex N: Quality-Based Sampling Examples
    Informative Annex O: Systems Manual
    Informative Annex P: Training Manual and Training Needs
    Informative Annex Q: Addenda Description Information

    Abstract - (Show below) - (Hide below)

    Describes the Commissioning Process capable of verifying that a facility and its systems meet the Owner's Project Requirements (OPR).

    Scope - (Show below) - (Hide below)

    The procedures, methods, and documentation requirements in this guideline describe each phase of the projectapplicable regulatory requirements, standards, and guidelines. The document includes both narrative descriptions and lists of individual items that support the design process

    General Product Information - (Show below) - (Hide below)

    Committee TC 9.1
    Document Type Standard
    Publisher American Society of Heating, Refrigerating & Air Conditioning Engineers
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    ASHRAE GUIDELINE 4 : 2008 : R2013 PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS
    Z5000-18 Building commissioning for energy using systems
    ASTM E 2774 : 2011 Standard Specification for Evaluation and Selection of Venues for Environmentally Sustainable Meetings, Events, Trade Shows, and Conferences (Withdrawn 2020)
    NFPA 99 : 2018 HEALTH CARE FACILITIES CODE
    NETA ECS : 2015 ELECTRICAL COMMISSIONING SPECIFICATIONS FOR ELECTRICAL POWER EQUIPMENT AND SYSTEMS
    ASHRAE GUIDELINE 1-4 SPANISH : 2014 PROCEDURES FOR PREPARING FACILITY SYSTEMS MANUALS
    UFC 4-510-01 : Change 2 UNIFIED FACILITIES CRITERIA - DESIGN: MILITARY MEDICAL FACILITIES
    ASHRAE GUIDELINE 29 : 2009 GUIDELINE FOR THE RISK MANAGEMENT OF PUBLIC HEALTH AND SAFETY IN BUILDINGS
    ASHRAE GUIDELINE 32 : 2012 SUSTAINABLE, HIGH-PERFORMANCE OPERATIONS AND MAINTENANCE
    ASHRAE/ACCA 180 : 2008 STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF COMMERCIAL BUILDING HVAC SYSTEMS
    ASHRAE HDBK HVAC APPLICATIONS : 2015 ASHRAE HANDBOOK - HVAC APPLICATIONS
    ASHRAE GUIDELINE 4 : 2008 PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS
    NFPA 3 : 2018 COMMISSIONING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS
    ASHRAE 202 SPANISH : 2013 COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS
    CSA Z320 : 2011 : R2016 BUILDING COMMISSIONING
    ASTM E 2813 : 2012 Standard Practice for Building Enclosure Commissioning
    CSA Z320 : 2011 : INC : UPD 1 : 2011 BUILDING COMMISSIONING
    CSA Z320 : 2011 BUILDING COMMISSIONING
    ASTM E 2813 : 2012 : EDT 1 Standard Practice for Building Enclosure Commissioning
    ASHRAE HDBK REFRIGERATION : 2014 ASHRAE HANDBOOK - REFRIGERATION
    UNI EN ISO 16484-1 : 2010 BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 1: PROJECT SPECIFICATIONS AND IMPLEMENTATION
    CSA Z8001 : 2013 COMMISSIONING OF HEALTH CARE FACILITIES
    DIN EN ISO 16484-1:2011-03 Building automation and control systems (BACS) - Part 1: Project specification and implementation (ISO 16484-1:2010)
    ISO 16484-1:2010 Building automation and control systems (BACS) — Part 1: Project specification and implementation
    BS EN ISO 16484-1:2010 Building automation and control systems (BACS) Project specification and implementation
    UNE-EN ISO 16484-1:2011 Building automation and control systems (BACS) - Part 1: Project specification and implementation (ISO 16484-1:2010)
    09/30202642 DC : 0 BS EN ISO 16484-1 - BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 1: PROJECT SPECIFICATION AND IMPLEMENTATION
    EN ISO 16484-1:2010 Building automation and control systems (BACS) - Part 1: Project specification and implementation (ISO 16484-1:2010)
    IES DG 29 : 2011 THE COMMISSIONING PROCESS APPLIED TO LIGHTING AND CONTROL SYSTEMS
    ASHRAE 202 : 2013 COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS
    I.S. EN ISO 16484-1:2010 BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 1: PROJECT SPECIFICATION AND IMPLEMENTATION
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective