• Shopping Cart
    There are no items in your cart

ASHRAE GUIDELINE 1-1 : 2007

Current

Current

The latest, up-to-date edition.

HVAC&R TECHNICAL REQUIREMENTS FOR THE COMMISSIONING PROCESS

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

23-06-2007

€78.07
Excluding VAT

Foreword
1 Purpose
2 Scope
3 Utilization
4 Definitions
5 Pre-Design Phase
6 Design Phase
7 Construction Phase
8 Occupancy and Operations Phase
Index to Annexes
Annex G - Commissioning Plan
Annex H - Acceptance Plan
Annex I - Owner's Project Requirements Workshop Guidance
Annex J - Owner's Project Requirements
Annex K - Basis of Design
Annex L - Specifications
Annex M - Construction Checklists
Annex N - Quality-Based Sampling Examples
Annex O - Systems Manual
Annex P - Training Manual and Training Needs
Annex Q - Publications, Articles, References, Codes, Regulations,
          and Standards
Annex R - Integration Requirements
Annex S - Interference and Coordination with Other Systems and
          Assemblies
Annex T - Communications: What, When, and Who
Annex U - Test Procedures and Data Forms

Defines the application of the commissioning process for each project delivery phase from Pre-Design through Owner Occupancy and Operations for all types and sizes of HVAC&R systems to support the commissioning process activities described in ASHRAE Guideline 0-2005, The Commissioning Process.

Committee
TC 7.9
DevelopmentNote
Supersedes ASHRAE GUIDELINE 1. (08/2008) Also available in Spanish edition, see ASHRAE GUIDELINE 1-1 SPANISH. (11/2012)
DocumentType
Standard
Pages
146
ProductNote
This product is unavailable in Russia, Belarus, Ukraine
PublisherName
American Society of Heating, Refrigerating & Air Conditioning Engineers
Status
Current
Supersedes

ASHRAE GUIDELINE 4 : 2008 : R2013 PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS
NFPA 99 : 2018 HEALTH CARE FACILITIES CODE
NETA ECS : 2015 ELECTRICAL COMMISSIONING SPECIFICATIONS FOR ELECTRICAL POWER EQUIPMENT AND SYSTEMS
UFC 4-510-01 : Change 2 UNIFIED FACILITIES CRITERIA - DESIGN: MILITARY MEDICAL FACILITIES
ASHRAE GUIDELINE 29 : 2009 GUIDELINE FOR THE RISK MANAGEMENT OF PUBLIC HEALTH AND SAFETY IN BUILDINGS
ASHRAE/ACCA 180 : 2008 STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF COMMERCIAL BUILDING HVAC SYSTEMS
ASHRAE GUIDELINE 4 : 2008 PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS
ASHRAE GUIDELINE 1-5 : 2012 THE COMMISSIONING PROCESS FOR SMOKE CONTROL SYSTEMS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.