• ASHRAE GUIDELINE 1-1 : 2007

    Current The latest, up-to-date edition.

    HVAC&R TECHNICAL REQUIREMENTS FOR THE COMMISSIONING PROCESS

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  23-06-2007

    Publisher:  American Society of Heating, Refrigerating & Air Conditioning Engineers

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Purpose
    2 Scope
    3 Utilization
    4 Definitions
    5 Pre-Design Phase
    6 Design Phase
    7 Construction Phase
    8 Occupancy and Operations Phase
    Index to Annexes
    Annex G - Commissioning Plan
    Annex H - Acceptance Plan
    Annex I - Owner's Project Requirements Workshop Guidance
    Annex J - Owner's Project Requirements
    Annex K - Basis of Design
    Annex L - Specifications
    Annex M - Construction Checklists
    Annex N - Quality-Based Sampling Examples
    Annex O - Systems Manual
    Annex P - Training Manual and Training Needs
    Annex Q - Publications, Articles, References, Codes, Regulations,
              and Standards
    Annex R - Integration Requirements
    Annex S - Interference and Coordination with Other Systems and
              Assemblies
    Annex T - Communications: What, When, and Who
    Annex U - Test Procedures and Data Forms

    Abstract - (Show below) - (Hide below)

    Defines the application of the commissioning process for each project delivery phase from Pre-Design through Owner Occupancy and Operations for all types and sizes of HVAC&R systems to support the commissioning process activities described in ASHRAE Guideline 0-2005, The Commissioning Process.

    General Product Information - (Show below) - (Hide below)

    Committee TC 7.9
    Development Note Supersedes ASHRAE GUIDELINE 1. (08/2008) Also available in Spanish edition, see ASHRAE GUIDELINE 1-1 SPANISH. (11/2012)
    Document Type Standard
    Product Note This product is unavailable in Russia, Belarus, Ukraine
    Publisher American Society of Heating, Refrigerating & Air Conditioning Engineers
    Status Current
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    ASHRAE GUIDELINE 4 : 2008 : R2013 PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS
    NFPA 99 : 2018 HEALTH CARE FACILITIES CODE
    NETA ECS : 2015 ELECTRICAL COMMISSIONING SPECIFICATIONS FOR ELECTRICAL POWER EQUIPMENT AND SYSTEMS
    UFC 4-510-01 : Change 2 UNIFIED FACILITIES CRITERIA - DESIGN: MILITARY MEDICAL FACILITIES
    ASHRAE GUIDELINE 29 : 2009 GUIDELINE FOR THE RISK MANAGEMENT OF PUBLIC HEALTH AND SAFETY IN BUILDINGS
    ASHRAE/ACCA 180 : 2008 STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF COMMERCIAL BUILDING HVAC SYSTEMS
    ASHRAE GUIDELINE 4 : 2008 PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS
    ASHRAE GUIDELINE 1-5 : 2012 THE COMMISSIONING PROCESS FOR SMOKE CONTROL SYSTEMS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective