ASHRAE GUIDELINE 5 : 1994
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
COMMISSIONING SMOKE MANAGEMENT SYSTEMS
25-03-2023
01-01-2001
1 Purpose
2 Scope
3 Recommissioning
4 Definitions
5 Pre-Design Phase
6 Design Phase
7 Construction Phase
8 Acceptance Procedures
9 Post-Acceptance Phase
10 References
Appendix A System Information Required
Appendix B Smoke Management System (SMS) Commissioning Process
Phases
Appendix C Sample Report Forms
Defines methods for verifying and documenting that the performance of smoke management systems conforms with design intent. Covers all types of smoke management systems; documentation of occupancy and use requirements and system design assumptions; documentation of design intent, system description and operation; functional performance testing and documentation necessary for evaluating system acceptance.
DocumentType |
Standard
|
ProductNote |
Reconfirmed 1994
|
PublisherName |
American Society of Heating, Refrigerating & Air Conditioning Engineers
|
Status |
Superseded
|
SupersededBy |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.