• There are no items in your cart

ASHRAE GUIDELINE 5 : 1994

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

COMMISSIONING SMOKE MANAGEMENT SYSTEMS

Superseded date

25-03-2023

Published date

01-01-2001

1 Purpose
2 Scope
3 Recommissioning
4 Definitions
5 Pre-Design Phase
6 Design Phase
7 Construction Phase
8 Acceptance Procedures
9 Post-Acceptance Phase
10 References
Appendix A System Information Required
Appendix B Smoke Management System (SMS) Commissioning Process
             Phases
Appendix C Sample Report Forms

Defines methods for verifying and documenting that the performance of smoke management systems conforms with design intent. Covers all types of smoke management systems; documentation of occupancy and use requirements and system design assumptions; documentation of design intent, system description and operation; functional performance testing and documentation necessary for evaluating system acceptance.

DocumentType
Standard
ProductNote
Reconfirmed 1994
PublisherName
American Society of Heating, Refrigerating & Air Conditioning Engineers
Status
Superseded
SupersededBy

Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.