• There are no items in your cart

ASME MFC 2M : 1983 : R2006

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

MEASUREMENT UNCERTAINTY FOR FLUID FLOW IN CLOSED CONDUITS

Available format(s)

Hardcopy , PDF

Superseded date

27-08-2021

Language(s)

English

Published date

01-01-2013

Foreword
Standards Committee Roster
Section 1 - Introduction
1.1 Objective
1.2 Scope
1.3 Nomenclature
1.4 Measurement Error
1.5 Measurement Error Sources
1.6 Dependency of Error Classes on the Defined Measurement
     Process
1.7 Measurement Uncertainty Interval - Combining Bias and
     Precision
1.8 Propagation of Measurement Errors
1.9 Measurement Uncertainty Analysis Report
1.10 Pretest vs Post-test Measurement Uncertainty Analysis
1.11 Measurement Uncertainty Analysis Procedure
1.12 List of References on Statistical Quality Control Charts
Section 2 - Examples
2.1 Introduction
2.2 General
2.3 Example One - Test Facility
2.4 Example Two - Back-to-Back Comparative Test
2.5 Example Three - Liquid Flow
Appendices
A - Glossary
B - Propagation of Errors by Taylor Series
C - Outlier Detection
D - Student's t Table

Gives a working outline detailing and illustrating the techniques for estimating measurement uncertainty for fluid flow in closed conduits.

DocumentType
Standard
Pages
76
ProductNote
Reconfirmed 2006
PublisherName
American Society of Mechanical Engineers
Status
Superseded
SupersededBy
Supersedes

ASQ B1/B2/B3:1996 Guide For Quality Control Charts - Control Chart Method Of Analyzing Data - Control Chart Method Of Controlling Quality During Production

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.