• Shopping Cart
    There are no items in your cart

ASME STP-NU-001 : 2005

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

RISK INITIATIVES IN ASME NUCLEAR CODES AND STANDARDS

Withdrawn date

29-08-2024

Published date

25-03-2005

Sorry this product is not available in your region.

Foreword
Summary
1 INTRODUCTION
2 NUCLEAR C&S DEVELOPMENTS
3 COHERENCE OF RISK INITIATIVES
References
Acknowledgments
Abbreviations and Acronyms

Gives an assessment of coherence among the nuclear power plant risk-informed initiatives that have been undertaken in the ASME Section XI, Operations and Maintenance (O&M), and Nuclear Risk Management organizations of ASME Nuclear C&S.

DocumentType
Standard
PublisherName
American Society of Mechanical Engineers
Status
Withdrawn

CFR 10(PTS0-199) : JAN 87 ENERGY - NUCLEAR REGULATORY COMMISSION
ANS 58.21-2007 EXTERNAL EVENTS IN PRA METHODOLOGY
ASME RA-S : 2008 LEVEL 1/LARGE EARLY RELEASE FREQUENCY PROBABILISTIC RISK ASSESSMENT FOR NUCLEAR POWER PLANT APPLICATIONS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.