• Shopping Cart
    There are no items in your cart

ASTM E 1368 : 2023

Current

Current

The latest, up-to-date edition.

Standard Practice for Visual Inspection of Asbestos Abatement Projects

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

28-06-2023

€61.92
Excluding VAT

Committee
D 22
DocumentType
Standard Practice
Pages
16
PublisherName
American Society for Testing and Materials
Status
Current
Supersedes

1.1This practice covers procedures for performing visual inspections of asbestos response actions to:

1.1.1Establish the extent of the required work before it begins;

1.1.2Determine the progress and quality of the work and evaluate the completeness of the response action; and

1.1.3Evaluate the cleanliness of the work area prior to final air testing for clearance (if performed), and subsequent to dismantling of critical barriers.

1.2This practice can be used on an abatement project, or for operations and maintenance (O&M) work, performed by the building owner's staff. It can also be used in conjunction with contract documents between the building owner and other parties involved in an abatement project.

Note 1:Standard contract documents (such as AIA and EJCDC documents) define contractual relationships and responsibilities for projects within the construction industry. Asbestos abatement projects differ from traditional construction projects in the manner of their design and execution, as well as in the type and level of oversight required to substantiate their successful completion. Non-traditional responsibilities are given to the building owner, project designer, and abatement contractor by this practice. Furthermore, responsibilities related to project oversight, inspections, and approvals are placed upon an additional non-traditional representative of the building owner; the project monitor, as defined by this practice. All parties are cautioned that the subject authorities and corresponding responsibilities be understood, mutually agreed upon, and correspondingly addressed with appropriate modifications, if necessary, to the contract documents for a specific project.

1.3This practice provides the following information:

1.3.1The objectives of the visual inspection process;

1.3.2The responsibilities and qualifications of the individuals involved in the visual inspections;

1.3.3The schedule of visual inspection activities during an abatement project and O&M work;

1.3.4The inspection procedures for the various types of abatement work and O&M tasks; and

1.3.5The criteria for certifying work as complete on the basis of the visual inspections.

1.4The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.

1.5Warning—Asbestos fibers are acknowledged carcinogens. Breathing asbestos fibers can result in disease of the lungs including asbestosis, lung cancer, and mesothelioma. Precautions in this standard practice should be taken to avoid creating and breathing airborne asbestos particles from materials known or suspected to contain asbestos. See 2.2 for regulatory requirements addressing asbestos.

1.6This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. For specific safety statements, see 12.2.

1.7This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

ASTM E 2356 : 2018 Standard Practice for Comprehensive Building Asbestos Surveys
ASTM D 7886 : 2014 : R2019 : EDT 1 Standard Practice for Asbestos Exposure Assessments for Repetitive Maintenance and Installation Tasks
ASTM E 2394 : 2011 : R2020 : EDT 1 Standard Practice for Maintenance, Renovation, and Repair of Installed Asbestos Cement Products
ASTM E 1513/E1513M : 1993 : R2023 Standard Practice for Application of Sprayed Fire-Resistive Materials (SFRMs)
ASTM E 1494 : 2018 Standard Practice for Testing Physical Properties of Friable Surfacing Materials

ASTM F 141 : 2012 : R2020 Standard Terminology Relating to Resilient Floor Coverings
ASTM E 631 : 2015 : R2024 Standard Terminology of Building Constructions
ASTM E 631 : 2015 Standard Terminology of Building Constructions
ASTM F 141 : 2023 Standard Terminology Relating to Resilient Floor Coverings

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.