ASTM E 1804 : 2002
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Standard Practice for Performing and Reporting Cost Analysis During the Design Phase of a Project
Hardcopy , PDF
11-11-2014
English
10-06-2002
Committee |
E 06
|
DocumentType |
Standard Practice
|
Pages |
4
|
PublisherName |
American Society for Testing and Materials
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
1.1 This practice covers an arranged method for providing cost analysis during the design phase of buildings.
1.2 The use of this practice increases the level of communication between the design professional, owner, and the cost professional providing the cost consulting services.
1.3 The practice establishes a structured method to support design decisions.
1.4 The practice provides design and cost professionals with a framework for historically tabulating information to be used on relevant future projects.
ASTM E 2083 : 2005 : R2016 | Standard Classification for Building Construction Field Requirements, and Office Overhead & Profit |
ASTM E 2103/E2103M : 2013 | Standard Classification for Bridge Elements—UNIFORMAT II |
ASTM E 3008/E3008M : 2016 | Standard Classification for Transportation Surface Elements—UNIFORMAT II |
ASTM E 2168 : 2010 : R2016 | Standard Classification for Allowance, Contingency, and Reserve Sums in Building Construction Estimating |
ASTM E 1557 : 2009 : R2015 | Standard Classification for Building Elements and Related Sitework—UNIFORMAT II |
ASTM E 2514 : 2015 | Standard Practice for Presentation Format of Elemental Cost Estimates, Summaries, and Analyses |
ASTM E 2516 : 2011 | Standard Classification for Cost Estimate Classification System |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.