ASTM E 2452 : 2012 : R2019
Current
The latest, up-to-date edition.
Standard Practice for Equipment Management Process Maturity (EMPM) Model
Hardcopy , PDF
English
01-05-2019
This practice covers a process for the assessment and reporting of an entity’s overall equipment management process maturity (EMPM).
Committee |
E 53
|
DocumentType |
Standard Practice
|
Pages |
9
|
PublisherName |
American Society for Testing and Materials
|
Status |
Current
|
Supersedes |
1.1This practice covers a process for the assessment and reporting of an entity’s overall equipment management process maturity (EMPM).
1.2The highest value is placed on continuous improvement as reflected in measured increases in maturity over time.
1.3The EMPM model is designed to be applicable and appropriate for all equipment-holding entities, however, the EMPM may not be the only acceptable assessment model available.
1.4It includes all aspects of equipment management.
1.5In addition to applicability to equipment and equipment management as defined in this practice, this practice may in whole or in part be effectively applied to intangible property, real property, and material.
1.6There is great variation across organizations regarding the internal departments that accomplish the various aspects of equipment management. Thus, all criteria are not applicable to all entities.
1.7This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.8This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
ASTM E 3015 : 2015 | Standard Guide for Management of Customer-Owned Property Assets in Possession of Supplier, Contractor or Subcontractor |
ASTM E 2675 : 2009 : R2014 | Standard Practice for Property Management System Outcomes |
ASTM E 2936 : 2013 | Standard Guide for Contractor Self Assessment for U.S. Government Property Management Systems |
ASTM E 3035 : 2015 | Standard Classification for Facility Asset Component Tracking System (FACTS) |
ASTM E 2631 : 2009 : R2015 | Standard Practice for Physical Placement of an Entity-Controlled Supplemental Identification Label |
ASTM E 2608 : 2008 : R2014 | Standard Practice for Equipment Control Matrix (ECM) |
ASTM E 2135 : 2004 | Standard Terminology for Property and Asset Management |
ASTM E 2135 : 2001 | Standard Terminology for Property and Asset Management |
ASTM E 2135 : 2007 : EDT 1 | Standard Terminology for Property and Asset Management |
ASTM E 2135 : 2010 | Standard Terminology for Property and Asset Management |
ASTM E 2131 : 2001 | Standard Practice for Assessing Loss, Damage, or Destruction of Property |
ASTM E 2132 : 2017 | Standard Practice for Inventory Verification: Electronic and Physical Inventory of Assets |
ASTM E 2132 : 2011 | Standard Practice for Inventory Verification: Electronic and Physical Inventory of Assets |
ASTM E 2135 : 2007 | Standard Terminology for Property and Asset Management |
ASTM E 2135 : 2010 : REV A : EDT 1 | Standard Terminology for Property and Asset Management |
ASTM E 2131 : 2016 | Standard Practice for Addressing and Reporting Losses of Tangible Property |
ASTM E 2135 : 2002 | Standard Terminology for Property and Asset Management |
ASTM E 2221 : 2002 | Standard Practice for Administrative Control of Property (Withdrawn 2011) |
ASTM E 2131 : 2016 : R2022 | Standard Practice for Addressing and Reporting Losses of Tangible Property |
ASTM E 2135 : 2010 : REV A | Standard Terminology for Property and Asset Management |
ASTM E 2135 : 2010 : REV A : EDT 2 | Standard Terminology for Property and Asset Management |
ASTM E 2131 : 2009 | Standard Practice For Addressing and Reporting Loss, Damage, or Destruction of Tangible Property |
ASTM E 2135 : 2022 | Standard Terminology for Property and Asset Management |
ASTM E 2279 : 2009 | Standard Practice for Establishing the Guiding Principles of Property Management |
ASTM E 2135 : 2006 | Standard Terminology for Property and Asset Management |
ASTM E 2132 : 2001 | Standard Practice for Physical Inventory of Durable, Moveable Property |
ASTM E 2132 : 2001 : R2007 | Standard Practice for Physical Inventory of Durable, Moveable Property |
ASTM E 2135 : 2010 : REV A : R2017 | Standard Terminology for Property and Asset Management |
ASTM E 2219 : 2002 | Standard Practice for Valuation and Management of Moveable, Durable Property (Withdrawn 2009) |
ASTM E 2135 : 2010 : REV A : R2017 : EDT 1 | Standard Terminology for Property and Asset Management |
ASTM E 2279 : 2015 | Standard Practice for Establishing the Guiding Principles of Property Asset Management |
ASTM E 2220 : 2002 | Standard Practice for Establishing the Full Valuation of the Loss/Overage Population Identified During the Inventory of Moveable, Durable Property (Withdrawn 2009) |
ASTM E 2279 : 2003 | Standard Practice for Establishing the Guiding Principles of Property Management |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.