• ATA MSG 3 : 2011.1

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    OPERATOR/MANUFACTURER SCHEDULED MAINTENANCE DEVELOPMENT

    Available format(s): 

    Superseded date:  03-12-2013

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Air Transport Association

    Sorry this product is not available in your region.

    Add To Cart

    Abstract - (Show below) - (Hide below)

    Defines a decision-logic process for determining initial scheduled maintenance requirements for new aircraft and/or power plants. It also provides a means for developing maintenance tasks and intervals acceptable to regulatory authorities, operators and manufacturers.

    General Product Information - (Show below) - (Hide below)

    Development Note Available in CD-ROM format. (06/2005)
    Document Type Standard
    Publisher Air Transport Association
    Status Superseded
    Superseded By

    Standards Referenced By This Book - (Show below) - (Hide below)

    FAA AC 25-19 : 2011 CERTIFICATION MAINTENANCE REQUIREMENTS
    SAE AIR 5128 : 2012 ELECTRICAL BONDING OF AIRCRAFT FUEL SYSTEMS
    SAE ARP 5764 : 2013(R2018) AEROSPACE ACTIVE INCEPTOR SYSTEMS FOR AIRCRAFT FLIGHT AND ENGINE CONTROLS
    IEC 60300-3-11:2009 Dependability management - Part 3-11: Application guide - Reliability centred maintenance
    I.S. EN 60300-3-11:2009 DEPENDABILITY MANAGEMENT - PART 3-11: APPLICATION GUIDE - RELIABILITY CENTRED MAINTENANCE
    UNE-EN 60300-3-11:2013 Dependability management -- Part 3-11: Application guide - Reliability centred maintenance
    MIL-STD-1798 Revision C:2013 MECHANICAL EQUIPMENT AND SUBSYSTEMS INTEGRITY PROGRAM
    FAA AC 121-22 : 2012 MAINTENANCE REVIEW BOARDS, MAINTENANCE TYPE BOARDS, AND OEM/TCH RECOMMENDED MAINTENANCE PROCEDURES
    SAE ARP 85 : 2012 AIR CONDITIONING SYSTEMS FOR SUBSONIC AIRPLANES
    BS EN 60300-3-11:2009 Dependability management Application guide. Reliability centred maintenance
    SAE ARP 4752 : 2013 AEROSPACE - DESIGN AND INSTALLATION OF COMMERCIAL TRANSPORT AIRCRAFT HYDRAULIC SYSTEMS
    EN 60300-3-11 : 2009 DEPENDABILITY MANAGEMENT - PART 3-11: APPLICATION GUIDE - RELIABILITY CENTRED MAINTENANCE
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective