• There are no items in your cart

ATIS T1.116 : 2000(R2005)

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

SIGNALING SYSTEM NUMBER 7 (SS7) - OPERATIONS, MAINTENANCE AND ADMINISTRATION PART (OMAP)

Superseded date

23-07-2013

Superseded by

ATIS 1000116 : 2000

Published date

12-01-2013

Sorry this product is not available in your region.

1. Scope, Purpose, and Application
1.1 Description of Management Model
1.2 Application Layer Model
1.3 Referenced and Related Standards
2. Operations and Maintenance Procedures for the
     Signalling Network
2.1 Management of Routing Data
2.2 MTP Routing Verification Test (MRVT)
2.3 Internetwork MRVT
2.4 Reception of a Message for an Unknown Destination
2.5 SCCP Routing Verification Test (SRVT)
2.6 Management of Link Equipment Failure
2.7 Link Fault Sectionalization
2.8 Transaction Verification Test (TrVT)
2.9 Long-Term Measurement Collection
2.10 On-occurrence Measurement Reporting
2.11 Delay Measurements
2.12 Clock Initialization
2.13 Real-Time Control
2.14 Operations
3. Operations and Maintenance Procedures for the Exchanges
3.1 Circuit Validation Test (CVT)
4. Operations and Maintenance Procedures for Both the
     Signalling Network and Exchanges
5. Requirements on the Protocols Used to Support the
     Operations and Maintenance Procedures
5.1 Addressing Capability
5.2 Distribution Capability
5.3 Connection-Oriented Communication Capability
5.4 Connectionless Communication Capability
5.5 File Transfer Capability
5.6 Other Capabilities
6. Timer Definitions and Values, and Performance Time
     Definitions and Values
6.1 Timer Definitions and Values
6.2 Performance Time Definitions and Values
7. State Transition Diagrams and TCAP Package Descriptions
7.1 State Transition Diagrams
7.2 TCAP Package Descriptions
8. ASE Definitions
8.1 MRVT ASE
8.2 SRVT ASE
8.3 Link Equipment Failure ASE
8.4 Link Fault Sectionalization ASE
8.5 TrVT ASE
Figures
1. SS7 Management Model
2. Connectionless Interpretation
3. Connection-oriented Interpretation
4. MTP Routing Verification Test (2 sheets)
5. SCCP Routing Verification Test SDL (3 sheets)
6. Management of Link Equipment Failure
7. Circuit Validation Test
8. Formal Definition of the OM-Services Used in the ASE
     (8 sheets)
9. ASN.1 Definition of TCAP (3 sheets)
Appendices
A. Primitive Interface
B. Example Messages
C. MTP & SCCP Settings
D. Glossary of Acronyms

Gives protocols and procedures for operations and maintenance information, which are associated with the applications layer of the Open Systems Interconnection (OSI) model and the Systems Management Application Process (SMAP) residing above the application layer.

Committee
PTSC
DevelopmentNote
Supersedes ATIS T1.115. (11/2002) Supersedes ATIS T1.116A. (08/2005) Redesignated as ATIS 1000116. (03/2010)
DocumentType
Standard
PublisherName
Alliance for Telecommunications Industry Solutions
Status
Superseded
SupersededBy
Supersedes

ATIS T1.114 : 2000 SIGNALING SYSTEM NUMBER 7 (SS7) - TRANSACTION CAPABILITIES APPLICATION PART (TCAP)
ATIS T1.115 : 1990 MONITORING AND MEASUREMENT FOR SIGNALING SYSTEM NUMBER 7 NETWORKS
ISO/IEC 9596:1990 Information technology — Open Systems Interconnection — Common management information protocol specification
ATIS T1.113 : 2000 SUPP B 2001 SIGNALLING SYSTEM NO. 7 (SS7) - INTEGRATED SERVICES DIGITAL NETWORK (ISDN) USER PART

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.