• AWS B2.1 : 2005

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    SPECIFICATION FOR WELDING PROCEDURE AND PERFORMANCE QUALIFICATION

    Available format(s): 

    Superseded date:  23-07-2013

    Language(s): 

    Published date:  12-01-2013

    Publisher:  American Welding Society

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Contents
    Personnel
    Foreword
    List of Tables
    List of Figures
    1. General Provisions
        1.1 Scope
        1.2 References
        1.3 Terms and Definitions
        1.4 Responsibilities
        1.5 Effective Date
        1.6 Safety Precautions
    2. Procedure Qualification
        2.1 General
        2.2 Standard Welding Procedure Specifications
        2.3 Welding Procedures Qualified by Employer
        2.4 Evaluation of Test Weldments
        2.5 Qualification Thickness Limitations
        2.6 Special Test Weldment Acceptance Criteria
        2.7 Groove Test Weldment and Acceptance Criteria
        2.8 Fillet Test Weldments and Acceptance Criteria
        2.9 Cladding Test Weldment and Acceptance Criteria
        2.10 Hardfacing Test Weldment and Acceptance Criteria
        2.11 Stud Welds and Acceptance Criteria
        2.12 Sheet Metal Weldment and Acceptance Criteria
        2.13 Welding Procedure Qualification
        2.14 Procedure Qualification Variables
    3. Performance Qualification
        3.1 General
        3.2 Qualification by Standard Test
        3.3 Qualification by Workmanship Test
        3.4 Test Weldments
        3.5 Examination Procedures and Acceptance Criteria
        3.6 Performance Qualification Variables
    Annex A - Basis for Establishing a Standard Welding Procedure
              Specification (WPS)
    Annex B - Illustrations - Weld Position, Test Specimens, and
              Text Fixtures
          B.1 Welding Positions - Illustrated
          B.2 Guided Bend Specimens
          B.3 Tension Specimens
          B.4 Cladding and Hardfacing Specimens
          B.5 Text Fixtures
    Annex C - Filler Metal Grouping
          C.1 F-Numbers
          C.2 A-Numbers
    Annex D - Base Metal Grouping
          D.1 Baser Metal Specifications
          D.2 M-Number Groupings
    Annex E - Radiographic Examination Procedure
          E.1 General
          E.2 Radiographic Procedure
          E.3 Personnel Requirements
          E.4 Acceptance Criteria
    Annex F - Macroetch Procedure
          F.1 General
          F.2 Safety Procedures
          F.3 Etching Solutions and Procedures
    AWS Welding Procedure and Performance Qualification Documents
    Tables
    2.1 Test Methods Required for Procedure Qualification
    2.2 Thickness and Size Limitation for Filler Welds for
         Procedure Qualification
    2.3 Thickness Limitations of Plate and Pipe for Groove
         Welds for Procedure Qualification
    2.4 Thickness Limitations for Cladding and Hardfacing for
         Procedure Qualification
    2.5 Thickness Limitations for Procedure Qualification - Sheet
         Metal Groove Welds
    2.6 Minimum Shear Strength for Aluminium Fillet Welds
    2.7 Minimum Tensile Load Requirements for Aluminium Stud Welds
    2.8 Minimum Torque Requirements for Steel Stud Welds
    2.9 Minimum Torque Requirements for Aluminium Stud Welds
    3.1 Examination Requirements for Performance Qualification
    3.2 Number of Bend Tests for Performance Qualification
    3.3 Allowable Base Metals for Performance Qualification
    3.4 Allowable Filler Metals for Performance Qualification
    3.5 Position Limitations for Performance Tests
    3.6 Pipe Diameter and Thickness Limitations for Performance
         Qualification on Groove Welds
    3.7 Plate Groove Weld Qualification Thickness Limitations
         for Performance Qualification on Groove Welds
    3.8 Pipe Fillet Weld Qualification Limitations for Performance
         Qualification
    3.9 Sheet Metal Qualification Thickness Limitations for
         Performance Qualification
    C.1 Grouping of Welding Electrodes and Rods for Qualification
    C.2 Classification of Ferrous Weld Metal for Procedure
         Qualification
    D.1 Listing of Base Metal Specifications
    D.2 M-Number Listing of Base Metals
    E.1 Acceptable Linear Discontinuities for Radiographic
         Examination
    E.2 Acceptable Rounded Discontinuities for Radiographic
         Examination

    Abstract - (Show below) - (Hide below)

    Covers all welding processes and an exhaustive array of materials used in metal fabrication. Spells out requirements for the qualification of welding procedures, and for the performance qualification of welders and welding operators. It is an excellent tool to ensure economical quality.

    General Product Information - (Show below) - (Hide below)

    Development Note SUPERSEDES AWS B3.0 AND AWS D10.9 (02/2000)
    Document Type Standard
    Publisher American Welding Society
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    NFPA 14 : 2016 INSTALLATION OF STANDPIPE AND HOSE SYSTEMS
    API 11D3 :2008 PROGRESSING CAVITY PUMP SYSTEMS FOR ARTIFICIAL LIFT - SURFACE-DRIVE SYSTEMS
    08/30168345 DC : DRAFT JULY 2008 BS ISO 15136-1 - DOWNHOLE EQUIPMENT FOR PETROLEUM AND NATURAL GAS INDUSTRIES - PROGRESSING CAVITY PUMP SYSTEMS FOR ARTIFICIAL LIFT - PART 1: PUMPS
    AWS EG3.0 : 1996 TRAINING AND QUALIFICATION OF WELDING PERSONNEL: LEVEL 2 - ADVANCEDWELDER, GUIDE FOR THE
    MIL-PRF-24751 Revision A:2004 FANS, VANEAXIAL GAS TURBINE ENCLOSURE COOLING NAVAL SHIPBOARD
    ANSI/AWWA D107-16 ERR 1(CSV) COMPOSITE ELEVATED TANKS FOR WATER STORAGE
    MIL-PRF-32152 Base Document:2005 CLOSURE, HVAC, BUTTERFLY TYPE, SHIPBOARD SERVICE
    AWS C7.1M/C7.1 : 2013 RECOMMENDED PRACTICES FOR ELECTRON BEAM WELDING AND ALLIED PROCESSES
    MIL-PRF-16552 Revision F:2001 FILTERS, AIR ENVIRONMENTAL CONTROL SYSTEM, CLEANABLE, IMPINGEMENT (HIGH VELOCITY TYPE)
    AWS D14.1/D14.1M:2005 SPECIFICATION FOR WELDING OF INDUSTRIAL AND MILL CRANES AND OTHER MATERIAL HANDLING EQUIPMENT
    AWS PASS : 1999 PROFESSIONAL'S ADVISOR ON WELDING OF STAINLESS STEEL
    AWS QC19 : 2002 ERRATA 2009 SPECIFICATION FOR AWS CERTIFICATION OF ROBOTIC ARC WELDING PERSONNEL
    AWS D17.1 : 2001 SPECIFICATION FOR FUSION WELDING FOR AEROSPACE APPLICATIONS
    AWS QC11 : 1996 SPECIFICATION FOR QUALIFICATION AND CERTIFICATION FOR LEVEL 2 - ADVANCED WELDERS
    AWS GWF : 1998 GUIDE FOR SETTING UP A WELDER TRAINING FACILITY
    AWS B5.1 : 2013 SPECIFICATION FOR THE QUALIFICATION OF WELDING INSPECTORS
    AWS PRGVT : 1999 PRACTICAL REFERENCE GUIDE FOR WELDING INSPECTION MANAGEMENT: VISUAL INSPECTION OF PRESSURE VESSELS AND PRESSURE PIPING
    AWS DPW : 1999 THE DESIGN AND PLANNING MANUAL FOR COST-EFFECTIVE WELDING
    NACE SP 02 92 : 2012 INSTALLATION OF THIN METALLIC WALLPAPER LINING IN AIR POLLUTION CONTROL AND OTHER PROCESS EQUIPMENT
    ASTM A 139 : 2000 Standard Specification for Electric-Fusion (Arc)-Welded Steel Pipe (NPS 4 and Over)
    NFPA 11 : 2016 LOW-, MEDIUM-, AND HIGH-EXPANSION FOAM
    MIL-PRF-32542 Base Document:2016 TRUCK, FORKLIFT, 4,000 AND 6,200 LB. CAPACITY, FRONT/SIDE LOADING, NON-PNEUMATIC, INTERNAL COMBUSTION ENGINE
    MIL-STD-2219 Revision A:2005 FUSION WELDING FOR AEROSPACE APPLICATIONS
    MIL PRF 62180 : D SEMITRAILER, FUEL TANKERS: 5000 GALLON, BULKHAUL, AUTOMOTIVE AND AIRCRAFT FUEL SERVICING
    MIL-B-16115 Revision G:1991 BUOYS, MOORING, AND MARKER
    NASA PRC 0011 : 2004 PROCESS SPECIFICATION FOR THE SEMI-AUTOMATIC AND MACHINE STUD WELDING OF NON FLIGHT HARDWARE
    MIL-DTL-62180 Revision E:1998 SEMITRAILER, FUEL TANKERS: 5000 GALLON, BULKHAUL, AUTOMOTIVE AND AIRCRAFT FUEL SERVICING
    MIL-P-52746 Revision C:1994 PUMP ASSEMBLY, FLAMMABLE LIQUID, CENTRIFUGAL, SELF PRIMING 2 INCH 100 GPM AT 100 FEET TOTAL DYNAMIC HEAD
    MIL-PRF-45316 Revision J:2011 TRAILER, TANK: POTABLE WATER, 400-GALLON, 2-WHEEL, M149A2
    MIL-PRF-24775 Revision A:2005 Air Conditioning Fan Coil Units, Horizontal and Vertical Types, Naval Shipboard
    ANSI/AWWA C200 : 2017 STEEL WATER PIPE, 6 IN. (150 MM) AND LARGER
    AWS B5.17:2014 SPECIFICATION FOR THE QUALIFICATION OF WELDING FABRICATORS
    AWS D10.7M/D10.7 : 2008 GUIDE FOR THE GAS SHIELDED ARC WELDING OF ALUMINUM AND ALUMINUM ALLOY PIPE
    AWS B5.5:2011 SPECIFICATION FOR THE QUALIFICATION OF WELDING EDUCATORS
    AWS D14.5 : 1997 SPECIFICATION FOR WELDING OF PRESSES AND PRESS COMPONENTS
    AWS WHC1.11 : 0 WELDING SCIENCE AND TECHNOLOGY, WELDING HANDBOOK, 9TH ED., VOL 1 - CHAPTER 11: MECHANIZED, AUTOMATED AND ROBOTIC WELDING
    AWS D1.2/D1.2M : 2014 STRUCTURAL WELDING CODE - ALUMINUM
    ANSI E1.21 : 2013 ENTERTAINMENT TECHNOLOGY - TEMPORARY STRUCTURES USED FOR TECHNICAL PRODUCTION OF OUTDOOR ENTERTAINMENT EVENTS
    AWS D18.1 : 1999 SPECIFICATION FOR WELDING OF AUSTENITIC STAINLESS STEEL TUBE AND PIPE SYSTEMS IN SANITARY (HYGIENIC) APPLICATIONS
    NACE RP 02 92 : 2003 INSTALLATION OF THIN METALLIC WALLPAPER LINING IN AIR POLLUTION CONTROL AND OTHER PROCESS EQUIPMENT
    NACE RP 01 99 : 2004 INSTALLATION OF STAINLESS CHROMIUM-NICKEL STEEL AND NICKEL-ALLOY ROLL-BONDED AND EXPLOSION-BONDED CLAD PLATE IN AIR POLLUTION CONTROL EQUIPMENT
    FM 5580 : 2012 HYBRID (WATER AND INERT GAS) FIRE EXTINGUISHING SYSTEMS
    FAA AC 33-6 : 2017 WELD REPAIR OF ALUMINUM CRANKCASES AND CYLINDERS OF PISTON ENGINES
    MIL-B-13265 Revision C:1985 BRIDGES, FIXED, STEEL, RAILWAY, UNIT CONSTRUCTION, 70-FT., 2-GIRDER SPAN: AND CONVERSION SETS: COMPONENTS OF
    AWS B5.4 : 2005 SPECIFICATION FOR THE QUALIFICATION OF WELDER TEST FACILITIES
    KKK-S-2851 Base Document:1994 SEMITRAILERS, REFUSE COLLECTION, COMPACTION TYPE: COMMERCIAL
    AWS C5.7 : 2000 RECOMMENDED PRACTICES FOR ELECTROGAS WELDING
    NASA MSFC SPEC 504 : 1990 WELDING, ALUMINIUM ALLOYS
    NASA PRC 0001 : 2012 PROCESS SPECIFICATION FOR THE MANUAL ARC WELDING OF ALUMINUM ALLOY HARDWARE
    NASA PRC 0015 : 2016 PROCESS SPECIFICATION FOR AUTOMATIC AND MACHINE ARC WELDING OF TITANIUM AND TITANIUM ALLOY HARDWARE
    NASA MSFC SPEC 560 : 1988 THE FUSION WELDING OF STEEL, CORROSION AND HEAT RESISTANT ALLOYS
    NASA PRC 0010 : 2012 PROCESS SPECIFICATION FOR AUTOMATIC AND MACHINE ARC WELDING OF STEEL AND NICKEL ALLOY HARDWARE
    NASA PRC 0005 : 2012 PROCESS SPECIFICATION FOR THE MANUAL ARC WELDING OF CARBON STEEL AND NICKEL ALLOY HARDWARE
    NASA PRC 0002 : 2012 PROCESS SPECIFICATION FOR THE MANUAL ARC WELDING OF TITANIUM ALLOY HARDWARE
    NASA PRC 0014 : 2012 PROCESS SPECIFICATION FOR FRICTION STIR WELDING
    MIL-PRF-32181 Revision B:2015 TRUCK, FORKLIFT, 4,000 AND 6,200 POUND CAPACITY, LOADING, INTERNAL COMBUSTION ENGINE
    AWS D14.4/D14.4M : 2012 SPECIFICATION FOR THE DESIGN OF WELDED JOINTS IN MACHINERY AND EQUIPMENT
    MIL-PRF-23798 Revision D:2004 Air Conditioner, Fan-Coil Assembly
    AWS D14.5/D14.5M:2009 SPECIFICATION FOR WELDING OF PRESSES AND PRESS COMPONENTS
    MIL-PRF-18953 Revision C:2005 FANS, VANEAXIAL AND TUBEAXIAL, VENTILATION AND AIR CONDITIONING, NAVAL SHIPBOARD
    MIL-PRF-19004 Revision B:2001 FANS, CENTRIFUGAL, VENTILATION, NAVAL SHIPBOARD
    MIL-C-24633 Revision A:1990 CHAIN, STUD LINK, ANCHOR, LOW ALLOY STEEL, FLASH BUTT WELDED
    API 11D3 : 2008 : R2015 PROGRESSING CAVITY PUMP SYSTEMS FOR ARTIFICIAL LIFT - SURFACE-DRIVE SYSTEMS
    AWS D14.2 : 1993 SPECIFICATION FOR METAL CUTTING MACHINE TOOL WELDMENTS
    AWS EG4.0 : 1996 GUIDE FOR THE TRAINING AND QUALIFICATION OF WELDING PERSONNEL: LEVEL 3, EXPERT WELDER
    AWS D1.6 : 1999 ERRATA 1999 STRUCTURAL WELDING CODE - STAINLESS STEEL
    AWS D14.1 : 1997 SPECIFICATION FOR WELDING INDUSTRIAL AND MILL CRANES AND OTHER MATERIAL HANDLING EQUIPMENT
    ASTM A 139/A139M : 2016 : REDLINE Standard Specification for Electric-Fusion (Arc)-Welded Steel Pipe (NPS 4 and Over)
    BS EN ISO 15136-2:2006 Petroleum and natural gas industries. Progressing cavity pump systems for artificial lift Surface drive systems
    MIL-PRF-83818 Revision C:2015 TRUCK, FORKLIFT, 4,000 AND 6,200 POUND CAPACITY, FRONT/SIDE LOADING, INTERNAL COMBUSTION ENGINE
    ISO 15136-2:2006 Petroleum and natural gas industries — Progressing cavity pump systems for artificial lift — Part 2: Surface-drive systems
    EN ISO 15136-2:2006 Petroleum and natural gas industries - Progressing cavity pump systems for artificial lift - Part 2: Surface-drive systems (ISO 15136-2:2006)
    AWWA D100 : 2011 WELDED CARBON STEEL TANKS FOR WATER STORAGE
    AWWA C226 : 2013 STAINLESS-STEEL FITTINGS FOR WATERWORKS SERVICE, SIZES 1/2 IN. THROUGH 72 IN. (13 MM THROUGH 1,800 MM)
    MIL-PRF-83041 Revision C:2000 FILTER-SEPARATOR, LIQUID FUEL SKID MOUNTED, 600 GALLONS PER MINUTE
    AWS WHC2.05 : 0 WELDING PROCESSES - PART 1, WELDING HANDBOOK, 9TH EDITION, VOL. 2 - CHAPTER 5: FLUX CORED ARC WELDING
    NASA PRC 0008 : 2004 PROCESS SPECIFICATION FOR THE QUALIFICATION OF MANUAL ARC WELDERS
    AWS D10.12M/D10.12:2000 GUIDE FOR WELDING MILD STEEL PIPE
    AWS D18.1/D18.1M : 2009 SPECIFICATION FOR WELDING OF AUSTENITIC STAINLESS STEEL TUBE AND PIPE SYSTEMS IN SANITARY (HYGIENIC) APPLICATIONS
    AWS C5.5/C5.5M : 2003 RECOMMENDED PRACTICES FOR GAS TUNGSTEN ARC WELDING
    AWS D3.7 : 2004 GUIDE FOR ALUMINUM HULL WELDING
    AWS C6.2/C6.2M : 2006 SPECIFICATION FOR FRICTION WELDING OF METALS

    Standards Referencing This Book - (Show below) - (Hide below)

    AWS D1.4 : 1998 STRUCTURAL WELDING CODE - REINFORCING STEEL
    AWS D11.2 : 1989 GUIDE FOR WELDING IRON CASTINGS
    AWS A3.0 : 0 STANDARD WELDING TERMS AND DEFINITIONS - INCLUDING TERMS FOR ADHESIVE BONDING, BRAZING, SOLDERING, THERMAL CUTTING, AND THERMAL SPRAYING
    AWS B4.0:2016 STANDARD METHODS FOR MECHANICAL TESTING OF WELDS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective