BIS IS 15111-2 : 2002(R2017)
Current
The latest, up-to-date edition.
SELF BALLASTED LAMPS FOR GENERAL LIGHTING SERVICES - PART 2: PERFORMANCE REQUIREMENTS
12-01-2013
FOREWORD
1 SCOPE
2 REFERENCES
3 TERMINOLOGY
4 SELECTION OF LAMPS FOR TESTS (SAMPLING)
5 CONDITIONS OF COMPLIANCE
6 DIMENSIONS
7 TEST CONDITIONS
8 STARTING AND RUN-UP
9 LAMP WATTAGE
10 LUMINOUS FLUX
11 COLOUR
12 LUMEN MAINTENANCE
13 LIFE
14 HARMONICS
15 LAMP EFFICACY
16 POWER FACTOR
17 TESTS
18 MARKING
ANNEX A - METHOD OF MEASURING LAMP CHARACTERISTICS
ANNEX B - COLOUR
ANNEX C - EMISSION (RADIATED AND CONDUCTED) OF RADIO
FREQUENCY DISTURBANCES
Describes the performance requirements together with the test methods and conditions, required to show compliance of tubular fluorescent and other gas discharge bare lamps with integrated means for controlling starting and stable operation (self ballasted lamps), intended for domestic and similar general lighting purposes.
Committee |
ETD 23
|
DocumentType |
Standard
|
PublisherName |
Bureau of Indian Standards
|
Status |
Current
|
BIS IS 14700-3-2 : 1999(R2003) | ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 3: LIMITS - SECTION 2: LIMITS FOR HARMONIC CURRENT EMISSIONS (EQUIPMENT INPUT CURRENT 16 A PER PHASE) |
BIS IS 6873-5 : 2012 | LIMITS AND METHODS OF MEASUREMENT OF RADIO DISTURBANCE CHARACTERISTICS - PART 5: ELECTRICAL LIGHTING AND SIMILAR EQUIPMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.