BIS IS 15663-3 : 2006(R2011)
Current
The latest, up-to-date edition.
DESIGN AND INSTALLATION OF NATURAL GAS PIPELINES - CODE OF PRACTICE - PART 3: PRE-COMMISSIONING AND COMMISSIONING OF PIPELINES
12-01-2013
FOREWORD
1 SCOPE
2 REFERENCE
3 TERMINOLOGY
4 GENERAL
5 PRE-COMMISSIONING
6 COMMISSIONING
7 DOCUMENTATION
Provides the minimum requirements for pre-commissioning and commissioning of natural gas pipeline, including pre-commissioning activities such as pre-commissioning checks, flushing, dewatering, swabbing, magnetic cleaning/electronic geometry pigging (EGP), drying, inertisation, gas-in and commissioning, stabilization and 72 h run.
Committee |
CED 7
|
DocumentType |
Standard
|
PublisherName |
Bureau of Indian Standards
|
Status |
Current
|
BIS IS 15663-1 : 2006(R2011) | DESIGN AND INSTALLATION OF NATURAL GAS PIPELINES - CODE OF PRACTICE - PART 1: LAYING OF PIPELINES |
BIS IS 15663-1 : 2006(R2011) | DESIGN AND INSTALLATION OF NATURAL GAS PIPELINES - CODE OF PRACTICE - PART 1: LAYING OF PIPELINES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.