BIS IS 2500-2 : 1965
Current
The latest, up-to-date edition.
SAMPLING INSPECTION PROCEDURES - PART 2: INSPECTION BY VARIABLES FOR PERCENT DEFECTIVE
12-01-2013
0. FOREWORD
1. SCOPE
2. TERMINOLOGY AND SYMBOLS
3. CONSIDERATIONS FOR THE CHOICE BETWEEN THE ATTRIBUTES AND
VARIABLES INSPECTION
4. PRELIMINARIES FOR THE SELECTION OF VARIABLES INSPECTION PLANS
5. SELECTION OF SAMPLING PLANS
6. TABLES AND ILLUSTRATIVE EXAMPLES
APPENDIX A - SYMBOLS
APPENDIX B - FORMULAE AND TABLES FOR CONSTRUCTING SINGLE
SAMPLING AQL-LTPD VARIABLES PLANS FOR ONE-SIDED
SPECIFICATION LIMITS
APPENDIX C - THE OPERATING CHARACTERISTICS CURVES
Specifies tables for single sampling plans for lot-by-lot inspection, when the inspection is done by variables.
Committee |
MSD 3
|
DocumentType |
Standard
|
PublisherName |
Bureau of Indian Standards
|
Status |
Current
|
BIS IS 7906-5 : 2004(R2009) | HELICAL COMPRESSION SPRINGS - PART 5: HOT COILED SPRINGS MADE FROM CIRCULAR SECTION BARS - SPECIFICATION |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.