0. FOREWORD
1. SCOPE
2. TERMINOLOGY
3. NECESSARY INFORMATION
4. MATERIALS
5. DESIGN CONSIDERATIONS
6. EQUIPMENT AND ACCESSORIES
7. CONSTRUCTION
APPENDIX A - DEGREE OF EXPANSIVENESS
APPENDIX B - SAFE LOAD ON UNDER-REAMED
PILES
APPENDIX C - MODULUS OF SUBGRADE
APPENDIX D - EQUIPMENT FOR UNDER-REAMED
PILES (MANUAL CONSTRUCTION)
APPENDIX E - BASIC PROPERTIES OF DRILLING
MUD (BENTONITE)
Specifies the design and construction of under-reamed piles having one or more bulb(s) formed along the stem.
Committee |
CED 43
|
DocumentType |
Standard
|
PublisherName |
Bureau of Indian Standards
|
Status |
Superseded
|
SupersededBy |
BIS IS 2911-1-4 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 4: PRECAST CONCRETE PILES IN PREBORED HOLES |
BIS IS 2911-1-3 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 3: DRIVEN PRECAST CONCRETE PILES |
BIS IS 2911-1-1 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 1: DRIVEN CAST IN-SITU CONCRETE PILES |
BIS IS 2911-4 : 2013 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 4: LOAD TEST ON PILES |
BIS IS 2911-1-2 : 2010 | DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 2: BORED CAST IN-SITU CONCRETE PILES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.