• There are no items in your cart

BIS IS 4968-2 : 1976(R2002)

Current

Current

The latest, up-to-date edition.

METHOD FOR SUBSURFACE SOUNDING FOR SOILS - PART 2: DYNAMIC METHOD USING CONE AND BENTONITE SLURRY

Published date

12-01-2013

Sorry this product is not available in your region.

Committee
CED 43
DocumentType
Standard
PublisherName
Bureau of Indian Standards
Status
Current

BIS IS 2911-1-4 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 4: PRECAST CONCRETE PILES IN PREBORED HOLES
BIS IS 2911-1-3 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 3: DRIVEN PRECAST CONCRETE PILES
BIS IS 2911-1-1 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 1: DRIVEN CAST IN-SITU CONCRETE PILES
BIS IS 2911-1-2 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 2: BORED CAST IN-SITU CONCRETE PILES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.