• There are no items in your cart

BS 1113:1999

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

Specification for design and manufacture of water-tube steam generating plant (including superheaters, reheaters and steel tube economizers)

Available format(s)

Hardcopy , PDF

Withdrawn date

12-01-2023

Language(s)

English

Published date

15-11-1999

€366.94
Excluding VAT

Committees responsible
Foreword
Summary of pages
Section 1 - General
1.1 Scope
1.2 Interpretation
1.3 Definitions
1.4 Responsibilities
1.5 Information and requirements to be agreed and to be
       documented
Section 2 - Materials and design stresses
2.1 Materials
2.2 Design stresses
Section 3 - Design
3.1 General
3.2 Metal wastage
3.3 Cylindrical shells of drums and headers
3.4 Openings and branches in cylindrical shells and
       integral pipes
3.5 Headers of rectangular section
3.6 Ends of drums and headers
3.7 Tubes and integral pipes
3.8 Pressure parts of irregular shape
Section 4 - Manufacture and workmanship
4.1 Pressure parts
4.2 Cutting, forming and fabrication tolerances
4.3 Welding
4.4 Mechanical connections
4.5 Thermal treatment

Defines requirements for the manufacture and design, including design stresses and materials, inspection, workmanship, testing, gauges, valves, marking and documentation and fittings of; water heating and steam plant used in association with steam generating plant, and water-tube steam generating plant subject to internal pressure.

Committee
PVE/2
DevelopmentNote
SUPERSEDES BS 1113(1998). (12/1999) Inactive for new design. (01/2012)
DocumentType
Standard
Pages
234
PublisherName
British Standards Institution
Status
Withdrawn
SupersededBy

1.1.1 This British Standard specifies requirements for the design and the manufacture, including materials and design stresses, workmanship, inspection, testing, documentation and marking, valves, gauges and fittings of: water-tube steam generating plant subject to internal pressure; and parts of steam and water heating plant used in association with steam generating plant. 1.1.2 In addition to the definitive requirements, this standard also requires the items detailed in 1.5 to be documented. For compliance with this standard, both the definitive requirements and the documented items have to be satisfied. 1.1.3 This British Standard applies to the following types of plant. Water-tube boilers including their integral steel tube economizers and superheaters and all other parts connected to the boiler without the interposition of a shut-off valve with the exception of valves and fittings specified in section7. Water-tube boilers are divided, for the purposes of this British Standard, into the following three classes. Natural circulation boilers, in which the circulation of the water through the tubes is a result of the thermo-syphonic head produced by heating. Forced, assisted or controlled circulation boilers, in which a pump is used either entirely or partly to promote circulation of the water through the tubes. Once-through boilers, in which the feed pump is used to force the flow of water and steam through the tubes. Steam reheaters (either integral with the boiler unit or independently fired) receiving steam which has passed through part of a turbine or other prime mover. Independently fired steam superheaters. lntegral superheaters separated by a shut-off valve from the evaporative circuits. Steel tube economizers (either integral with the boiler or independently fired) separated by a shut-off valve from the boiler. NOTE For convenience, the term ‘boiler’ used throughout this standard includes the types of plant described in a) to e). 1.1.4 This standard applies to the pressure parts of boilers and superheaters (as described in 1.1.3a) and d)) containing water and steam up to and including the valves separating these water and steam spaces from the steam pipes to other equipment, water supply pipes, drain pipes and the surrounding atmosphere (safety valves and vents). In the case of reheaters (see 1.1.3b), this standard applies to pressure parts from the piping connection(s) at the inlet header to the piping connection(s) at the outlet header except that where a device is provided in reheat piping to blank off the reheater for hydraulic testing, this standard applies up to and including this device. In the case of independently fired superheaters (see 1.1.3c), and economizers (see 1.1.3e), the standard applies to the pressure parts containing steam and water respectively between the inlet and exit valves, including the respective valves and connections to drain pipes and to the atmosphere. 1.1.5 Section4 of this standard (manufacture and workmanship) includes requirements applicable to the normal function of the boilermaker. Requirements for the quality of workmanship of plates, tubes, forgings and castings in the condition in which they are normally supplied to the boilermaker are included in the standards in the series specifying such materials. 1.1.6 This standard does not apply to brickwork or other settings or supports, or to insulation, or to air preheaters, mechanical stokers, fuel burning or ash disposal equipment, forced or induced draught equipment or their accessories. These items are matters for mutual agreement between the purchaser and the manufacturer. NOTE Where such items are required or contemplated, it is recommended that all particulars which could affect the boiler(s) should be disclosed by the purchaser to the manufacturer at the time of the enquiry. 1.1.7 This standard applies only to boilers manufactured under the survey of a competent engineering Inspecting Authority or organization. The intent of this requirement may be regarded as satisfied where inspection is carried out by competent personnel of a separate engineering inspection department maintained by the purchaser of the boiler. An inspection department maintained by the manufacturer does not satisfy this requirement except: that specific responsibilities may be delegated at the discretion of the Inspecting Authority or organization; or in the case of boilers for the manufacturer’s own use and not for resale. This standard applies only to boilers made by manufacturers who can satisfy the Inspecting Authority or organization that they are competent and suitably equipped to fulfil the requirements specified. In assessing the competence of a manufacturer, the Inspecting Authority or organization shall take into consideration any related nationally approved certification against the BS5750 series of quality system standards. NOTE The titles of the publications referred to in this standard are listed on the last page.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.