• Shopping Cart
    There are no items in your cart

BS 37-5:1955

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Specification. Electricity meters Polyphase kilowatt maximum demand meters

Available format(s)

Hardcopy

Superseded date

31-12-1986

Superseded by

BS 5685-3:1986

Language(s)

English

Published date

31-10-1978

€243.07
Excluding VAT

Maximum demand meters, combining energy elements (motor type) registering in kWh or MWh, maximum demand indicators (mechanically coupled) or suitable for fitting such indicators, indicating in kW or MW, and timing elements; not the timing elements which may or may not be contained in meter case, not meters depending on balanced conditions of load or supply, not precision meters. Types (a) Whole-current and transformer-operated, for 2-phase, 3- or 4-wire supplies, (b) Whole-current and transformer-oper ated, for 3-phase, 3- or 4-wire supplies.

Committee
PEL/13
DocumentType
Standard
Pages
0
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.