Committees responsible
Foreword
Method
Introduction
1 Scope
2 References
3 Electrostatic precipitator method for smoke
emission rate measurement
4 Dilution tunnel method for smoke emission rate
measurement
Annexes
A (informative) Comparison of results obtained by
the dilution tunnel and electrostatic precipitator
methods
B (informative) Calculation of in-stack concentration
Tables
A.1 Comparison of results obtained with fuel A
A.2 Comparison of results obtained with fuel B
Figures
1 General arrangement of electrostatic precipitator
2 Supporting frame of electrostatic precipitator
3 Section through skirt of electrostatic precipitator
(at bracket position)
4 Electrostatic precipitator positioned for smoke
collection
5 Earthing tool for electrostatic precipitator
6 General arrangement of dilution tunnel and sampling
train
7 Suggested arrangement of dilution tunnel filter
housing
8 Design of sample nozzle
9 Section through dilution tunnel showing measurement
positions for nine-point traverses
List of references