BS 5192-3:1993
Current
The latest, up-to-date edition.
Guide to production control Ordering methods
Hardcopy , PDF
English
15-05-1993
Committees responsible
Foreword
Guide
Introduction
1 Scope
2 References
3 Definitions
4 The order
5 Ordering systems
6 Stock control systems
7 Period batch control (PBC)
8 Material requirements planning (MRP)
9 Just-in-time (JIT)
Tables
1 Standard ordering system classifications
2 Common stock categories
3 Stock control applications
4 Typical ABC analysis of stock using computer
calculations
5 Uses of stock control systems
Figures
1 Stages of production control
2 Bill of material
3 Example of when to order
4 A feedback system
5 Single- and multi-cycle ordering
6 Fixed order quantity system
7 Service level
8 Fixed interval re-order system
9 ABC analysis
10 Fixed order quantity with allocations
11 Min-max re-order system
12 Deficiencies of stock control
13 Variations in stocks due to multi-cycle ordering
14 PBC as an extension of flexible programming
15 The PBC process
16 Bought items and PBC
17 The PBC system
18 MRP logic flow diagram
19 MRP scrap and yield calculation
20 The kanban system
21 Kanban types
List of references
Gives advice on ordering in all types of production industry ranging from the most complicated to the simplest case of engineering multi-product batch production. Describes the decisions to be made and the methods that can ensure that these decisions are made efficiently. Coverage includes definitions, ordering systems, stock control systems and period batch control. Also includes tables and diagrams.
Committee |
W/-
|
DevelopmentNote |
Supersedes 90/97589 DC. (07/2005) Reviewed and confirmed by BSI, November 2012. (10/2012)
|
DocumentType |
Standard
|
Pages |
42
|
PublisherName |
British Standards Institution
|
Status |
Current
|
Supersedes |
This Part of BS 5192 gives guidance on ordering in all types of production industry ranging from the simplest to the most complicated case of engineering multi-product batch production. It describes the decisions to be made and the systems and methods that can ensure that these decisions are made efficiently. A number of ordering systems are described together with their applicability. The level of detail is sufficient to guide the readers on the choice of a system or systems appropriate to their industry.
BS 5192-1:1993 | Guide to production control Introduction |
BS 5192-6:1993 | Guide to production control Computer aided production control |
BS 5192-2:1993 | Guide to production control Production programming |
BS 5192-4:1993 | Guide to production control Dispatching (shop-floor control) |
BS 5191:1975 | Glossary of production planning and control terms |
BS 5192-4:1993 | Guide to production control Dispatching (shop-floor control) |
BS 5192-1:1993 | Guide to production control Introduction |
BS 5729-3:1983 | Guide to stock control Replenishment of stock |
BS 5192-2:1993 | Guide to production control Production programming |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.