BS 5507-3:1982
Current
The latest, up-to-date edition.
Methods of test for falsework equipment Props
Hardcopy , PDF
English
26-02-1982
Foreword
Cooperating organizations
Method
1 Scope
2 References
3 Principle
4 Apparatus
5 Test procedure
6 Recording of test load
7 Test report
Figures
1 Arrangement of test apparatus
2 Examples of props that have set with an angle at the
junction of the two halves
Specifies requirements for determining the compressive strength of props.
| Committee |
B/514/26
|
| DevelopmentNote |
Supersedes 81/10645 DC (03/2005) Reviewed and confirmed by BSI, January 2010. (12/2009)
|
| DocumentType |
Standard
|
| Pages |
10
|
| PublisherName |
British Standards Institution
|
| Status |
Current
|
| SupersededBy |
This British Standard describes a method of test for the purpose of determining the ultimate load carrying capacity of props.
| Standards | Relationship |
| UNE-EN 60684-3-214:2005 | Identical |
| 17/30349707 DC : DRAFT AUG 2017 | BS 5975:2018 - CODE OF PRACTICE FOR TEMPORARY WORKS PROCEDURES AND THE PERMISSIBLE STRESS DESIGN OF FALSEWORK |
| BS 5975(2008) : 2008 | CODE OF PRACTICE FOR TEMPORARY WORKS PROCEDURES AND THE PERMISSIBLE STRESS DESIGN OF FALSEWORK |
| BS 4074:1982 | Specification for metal props and struts |
| BS DD89(1983) : 1983 | METHODS FOR TESTING AND ASSESSING THE PERFORMANCE OF PREFABRICATED HEAVY DUTY SUPPORT TOWERS |
| 07/30150912 DC : 0 | BS 5975 - CODE OF PRACTICE FOR THE PROCEDURAL CONTROL OF TEMPORARY WORKS AND THE PERMISSIBLE STRESS DESIGN OF FALSEWORK |
| BS 5975:1996 | Code of practice for falsework |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.