Committees responsible
National foreword
Specification
1 Scope
2 Normative references
3 Definitions
4 Supplier and product qualification
4.1 Supplier qualification
4.2 Product qualification
4.3 Example of product qualification
5 Skip-lot procedures
5.1 Determining the initial skip-lot inspection
frequency
5.2 Examples of the initial frequency determination
5.3 Reducing the frequency of inspection
5.4 Lot selection and inspection procedures (States 2
and 3)
5.5 Interrupt procedures
5.6 Requalification procedures
5.7 Disqualification
6 Supplier responsibilities
7 Inspection agency and responsible authority
responsibilities
8 Characteristics of the skip-lot procedures
Annexes
A (normative) Summary of the options to be agreed
prior to qualification (see 1.2)
B (normative) Procedures for random selection at
specified inspection frequencies
C (informative) Factors used in deciding between
skip-lot inspection (ISO 2859-3) and reduced
inspection (ISO 2859-1)
D (informative) Bibliography
Tables
1 Minimum cumulative sample size to initiate skip-lot
inspection
2 Acceptance numbers to initiate, continue or resume
skip-lot inspection
Figures
1 Basic structure of the skip-lot procedures
2 Determination of the initial skip-lot inspection
frequency
3 Flowchart for the skip-lot procedures