BS 6046-2:1992
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Use of network techniques in project management Guide to the use of graphical and project estimating techniques
Hardcopy , PDF
15-06-1996
English
28-02-1992
Committees responsible
Foreword
Guide
Section 1. General
0. Introduction
1. Scope
2. Definitions
Section 2. Graphical techniques
3. Choice of network mode
4. Recommended drawing methods
Section 3. Project estimating techniques
5. General: values to be estimated
6. Estimation of values
7. Estimation error
8. Identification and reduction of errors
Tables
1. Checklist: main factors in the choice of network
mode
2. Recommended symbols for use on activity-on-arrow
networks
3. Recommended symbols for use on activity-on-node
networks
Figures
1. Typical project management procedures
2. Example of activity-on-arrow network
3. Example of activity-on-node network
4. Comparison of network drawing modes
5. Methods of showing sloping arrows
6. Method of showing outgoing activities (activity-on-
arrow)
7. Method of showing incoming activities (activity-on-
arrow)
8. Method of showing dummy crossing activity arrows
9. Methods of showing outgoing activities (activity-
on-node)
10. Methods of showing incoming activities (activity-
on-node)
11. Methods of showing the four types of relationship
between linked activities
12. Method of showing method of potentials diagram
13. Method of showing text layout for activity
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.