BS 6046-2:1992

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Use of network techniques in project management Guide to the use of graphical and project estimating techniques

Available format(s)

Hardcopy , PDF

Withdrawn date

15-06-1996

Language(s)

English

Published date

28-02-1992

€231.38
Excluding VAT

Committees responsible
Foreword
Guide
Section 1. General
0. Introduction
1. Scope
2. Definitions
Section 2. Graphical techniques
3. Choice of network mode
4. Recommended drawing methods
Section 3. Project estimating techniques
5. General: values to be estimated
6. Estimation of values
7. Estimation error
8. Identification and reduction of errors
Tables
1. Checklist: main factors in the choice of network
     mode
2. Recommended symbols for use on activity-on-arrow
     networks
3. Recommended symbols for use on activity-on-node
     networks
Figures
1. Typical project management procedures
2. Example of activity-on-arrow network
3. Example of activity-on-node network
4. Comparison of network drawing modes
5. Methods of showing sloping arrows
6. Method of showing outgoing activities (activity-on-
     arrow)
7. Method of showing incoming activities (activity-on-
     arrow)
8. Method of showing dummy crossing activity arrows
9. Methods of showing outgoing activities (activity-
     on-node)
10. Methods of showing incoming activities (activity-
     on-node)
11. Methods of showing the four types of relationship
     between linked activities
12. Method of showing method of potentials diagram
13. Method of showing text layout for activity

Guidance on the two graphical methods of representing the activities in a project: \'activity-on-arrow\' and \'activity-on-mode\'. A checklist highlights the main factors to consider before choosing the network mode. Recommendations on the level of detail to include, conventions and symbols to use and the estimation of values required for analysing networks.

Committee
MS/2
DevelopmentNote
Supersedes BS 6046: Pt2: 1981
DocumentType
Standard
Pages
28
PublisherName
British Standards Institution
Status
Withdrawn
Supersedes

BS 6046-3:1992 Use of network techniques in project management Guide to the use of computers
BS 5192-2:1993 Guide to production control Production programming
PD 3542:1991 The role of standards in company quality management
BS 6046-4:1992 Use of network techniques in project management Guide to resource analysis and cost control
BS 3843-3:1992 Guide to terotechnology (the economic management of assets) Guide to the available techniques
BS 5192-1:1993 Guide to production control Introduction

BS 6046-4:1992 Use of network techniques in project management Guide to resource analysis and cost control
BS 6046-1:1984 Use of network techniques in project management Guide to the use of management, planning, review and reporting procedures
BS 6046-3:1992 Use of network techniques in project management Guide to the use of computers

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.