BS 6046-3:1992
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Use of network techniques in project management Guide to the use of computers
Hardcopy , PDF
15-06-1996
English
28-02-1992
Committees responsible
Foreword
Guide
0. Introduction
1. Scope
2. Definitions
3. Purpose, structure and recommended use of the guide
4. Choice between manual and computer application
5. Selection of a software package
6. Choice of coding system
Appendix
A. Computer related terms
Tables
1. Checklist: choice between manual and computer
application
2. Checklist: selection of a software package
3. Checklist: choice of coding systems
Figures
1. Typical project management procedures
2. Flow chart for the coding process
3. Example of the structure of a code
Guidance on the application of a computer in project network analysis. Discusses advantages and disadvantages of computer application compared with manual analysis and gives advice on suitable software package, selection of computing facilities and use of coding systems.
Committee |
MS/2
|
DevelopmentNote |
Supersedes BS 6046: Pt3: 1981
|
DocumentType |
Standard
|
Pages |
28
|
PublisherName |
British Standards Institution
|
Status |
Withdrawn
|
Supersedes |
BS 5192-2:1993 | Guide to production control Production programming |
PD 3542:1991 | The role of standards in company quality management |
BS 6046-4:1992 | Use of network techniques in project management Guide to resource analysis and cost control |
BS 3843-3:1992 | Guide to terotechnology (the economic management of assets) Guide to the available techniques |
BS 6046-2:1992 | Use of network techniques in project management Guide to the use of graphical and project estimating techniques |
BS 5192-1:1993 | Guide to production control Introduction |
BS 6046-2:1992 | Use of network techniques in project management Guide to the use of graphical and project estimating techniques |
BS 6046-4:1992 | Use of network techniques in project management Guide to resource analysis and cost control |
BS 6046-1:1984 | Use of network techniques in project management Guide to the use of management, planning, review and reporting procedures |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.