BS 6046-4:1992
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Use of network techniques in project management Guide to resource analysis and cost control
Hardcopy , PDF
15-06-1996
English
28-02-1992
Committees responsible
Foreword
Guide
0. Introduction
1. Scope
2. Definitions
3. General considerations
4. Resource analysis
5. Cost analysis of projects
Tables
1. Data used in the example given in figures 1 to 6
2. Review of resource analysis output
Figures
1. Example of early start aggregation of two resources
(based on the data given in table 1)
2. Example of late start aggregation of two resources
(based on the data given in table 1)
3. Example of cumulation of two resources (based on
the data given in table 1)
4. Example of allocation of two resources with fixed
resource limits (based on the data given in table 1)
5. Example of allocation of two resources with fixed
time limit (based on the data given in table 1)
6. Example of smoothing two resources (based on the
data given in table 1)
7. Cumulative cost curves
8. Use of hammock activity in network
Provides guidance on the use of these two techniques as a natural extension of the use of time analysis as a means of improving the management of projects.
Committee |
MS/2
|
DevelopmentNote |
Supersedes BS 6046: Pt4: 1981
|
DocumentType |
Standard
|
Pages |
36
|
PublisherName |
British Standards Institution
|
Status |
Withdrawn
|
Supersedes |
BS 6046-3:1992 | Use of network techniques in project management Guide to the use of computers |
BS 5192-2:1993 | Guide to production control Production programming |
PD 3542:1991 | The role of standards in company quality management |
BS 3843-3:1992 | Guide to terotechnology (the economic management of assets) Guide to the available techniques |
BS 6046-2:1992 | Use of network techniques in project management Guide to the use of graphical and project estimating techniques |
BS 5192-1:1993 | Guide to production control Introduction |
BS 6046-2:1992 | Use of network techniques in project management Guide to the use of graphical and project estimating techniques |
BS 6046-1:1984 | Use of network techniques in project management Guide to the use of management, planning, review and reporting procedures |
BS 6046-3:1992 | Use of network techniques in project management Guide to the use of computers |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.