• There are no items in your cart

BS CECC 00114-6:1994

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by
withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Rule of procedure 14. Quality assessment procedures Technology approval of electronic component manufacturers

Available format(s)

Hardcopy , PDF

Withdrawn date

29-10-2018

Language(s)

English

Published date

15-08-1994

Foreword
Preface
Abbreviations
Introduction
Related Documents
1 Definitions
2 General procedures
2.1 Eligibility for Technology Approval
2.1.1 Relationship between Manufacturer's Approval and
        Technology Approval
2.1.2 Extension of Manufacturer's Approval
2.1.3 Control Site
2.2 Application for Technology Approval
3 Management Responsibility
3.1 Management Commitment
3.2 Operational Infrastructure
3.2.1 Management Structure
3.2.2 Additional responsibilities of the CECC System
        Manager (CSM)
3.2.3 Technical decision-making
4 Technology Approval Requirements
4.1 Technology Approval Declaration Document (TADD)
4.2 Requirements for a TADD
4.2.1 Management commitment to quality
4.2.2 Description of technology and processes
4.2.3 Definitions of the relevant sites and operations
4.2.4 Test vehicles
4.2.5 Internal audit plan
4.2.6 Quality improvement programme
4.2.7 Statistical methods of evaluation
4.2.8 Management of non-conforming products or
        activities
4.2.9 New product introduction programme
4.2.10 Interrelationship with subcontractors
4.2.11 Company definitions and symbols
4.2.12 List of components covered by Technology
        Approval
4.3 Use of specialist contractors and subcontracting
4.4 Incorporated components
5 Verification
5.1 Verification of process in accordance with the
        TADD
5.2 Verification of process boundaries
5.2.1 Design
5.2.2 Manufacturing
5.2.3 Internal Audits
5.3 Control of internal and external interfaces
6 Product Documentation
6.1 Contractual Specifications
6.1.1 Registered CECC Detail Specification
6.1.2 Customer Detail Specification (CDS)
6.1.3 Manufacturers product data
6.2 Register of CECC Detail Specifications
6.3 Registration of Approval
6.3.1 Abstract of Technology Approval
6.3.2 Registration of qualified components
7 Procedure for Technology Approval
7.1 Submission of TADD
7.2 Statement of Readiness
7.3 Assessment and Certification
7.3.1 Validation of TADD implementation
7.3.2 Examination of internal audit data
7.3.3 Proposal for issue of TA certification
7.3.4 Granting of Technology Approval
7.3.5 Technology Approval Certificate
7.4 Release of certified products
7.4.1 Attestation of Conformity
7.4.2 Release prior to the issue of an approval
        certificate
7.5 Maintenance of Approval
7.5.1 Manufacturer's documentation
7.5.2 Manufacturer/ONS periodic review
7.5.3 Redeclaration of Conformance
7.6 Changes affecting the TADD
7.6.1 Extensions/Amendments to Technology Approval
7.6.2 ONS review of TADD
7.6.3 Manufacturer's declaration of readiness
7.6.4 ONS decision to audit in respect of amended TADD
7.6.5 Issue of new or amended Certificate
7.6.6 Release of products affected by changes
7.7 Withdrawal of Technology Approval
Annexes
A Application for Technology Approval
B CECC Audit Statement of Readiness Company
        Declaration
C Definitions
D Form and Content of a TADD
Diagrams
1 Initial Technology Approval
2 Changes to Technology Approval

Technology approval is a method of approving a complete technological process (design, process realization, product manufacture, test and shipment) covering the qualification aspects common to all products as determined by the technology under consideration.

Committee
L/1
DevelopmentNote
DRAFT FOR COMMENT 93/207081 DC
DocumentType
Standard
Pages
48
PublisherName
British Standards Institution
Status
Withdrawn
SupersededBy

Standards Relationship
CECC 00114-6 : 1994 Identical

BS CECC 00111-8:1994 Rule of procedure 11. Specifications Regulations for Technology Approval Schedules (TAS)
BS CECC 00114-0:1994 Rule of procedure 14. Quality assessment procedures An introduction to the types of approval available under the CECC system
BS CECC 210000:1995 Harmonized system of quality assessment for electronic components. Requirements for technology approval schedules (TAS)

View more information
€216.35
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.