BS EN 10226-3:2005
Current
The latest, up-to-date edition.
Pipes threads where pressure-tight joints are made on the threads Verification by means of limit gauges
Hardcopy , PDF
English
30-04-2016
Foreword
1 Scope
2 Normative reference
3 Terms and definitions
4 Symbols
5 Design of gauges
5.1 General
5.2 Taper full form threaded plug gauges (gauges No. 1
and No. 2)
5.3 Parallel full form threaded ring gauge (gauge No. 3)
5.4 Taper plain ring gauge (gauge No. 4)
5.5 Taper modified thread form check plug gauge (gauge
No. 5)
5.6 Parallel modified thread form check ring gauge (gauge
No. 6)
6 Use of gauges and checking of pipe threads
6.1 General
6.2 Checking of internal taper (Rc) and internal parallel
(Rp) threads
6.3 Checking of external taper (R) threads
7 Gauge dimensions and manufacturing tolerances, checking of
new gauges and checking gauges for wear
7.1 Gauge dimensions and manufacturing tolerances
7.2 Checking of new gauges
7.3 Checking gauges for wear
7.4 Marking of gauges
Annex A (normative) Summary of gauges
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.