• Shopping Cart
    There are no items in your cart

BS EN 12952-9:2002

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Water-tube boilers and auxiliary installations Requirements for firing systems for pulverized solid fuels for the boiler

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

07-01-2003

Superseded date

30-11-2022

Superseded by

BS EN 12952-9:2022

€263.42
Excluding VAT
Summarise this standard

Foreword
1 Scope
   1.1 Firing systems
   1.2 Fuels
   1.3 Operation
   1.4 Boundary of pulverizing system
2 Normative references
3 Terms and definitions
4 Fuel storage facilities with conveying plant
   4.1 General
   4.2 Conveying plant
   4.3 Coal bunkers
5 Pulverizing system and pulverized fuel system
   5.1 General
   5.2 Coal Feeders
   5.3 Mills
   5.4 Pulverized fuel bins
   5.5 Pulverized fuel supply pipes and shutoff devices
6 Explosion prevention measures for pulverizing systems
   and pulverized fuel systems
   6.1 General
   6.2 Plants operated without inert gas protection
   6.3 Plants operated with inert gas protection
7 Equipment for air supply and flue gas discharge
   7.1 Air supply
   7.2 Air/fuel ratio
   7.3 Flue gas discharge
8 Firing system
   8.1 General
   8.2 Burners for pulverized fuel
   8.3 Flue gas recirculation
   8.4 Modification of the firing system setting
   8.5 Monitoring and control
   8.6 Electrical equipment
   8.7 Safety precautions
9 Ash extraction plant
10 Operation and maintenance
   10.1 General
   10.2 Operating manual and instructions
Annex A (informative) Operational requirements for permanently
          supervised firing system for pulverized fuel
Annex ZA (informative) Clauses of this European Standard
          addressing essential requirements or other provisions
          of the Pressure Equipment Directive
Bibliography

Relates to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized fuel storage system and ends at the ash extraction plant.

Committee
PVE/2
DevelopmentNote
Supersedes 99/709763 DC (01/2003)
DocumentType
Standard
Pages
28
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
NS EN 12952-9 : 1ED 2003 Identical
I.S. EN 12952-9:2002 Identical
NEN EN 12952-9 : 2003 Identical
NBN EN 12952-9 : 2003 Identical
NF EN 12952-9 : 2003 Identical
EN 12952-9:2002 Identical
DIN EN 12952-9:2003-04 Identical
UNE-EN 12952-9:2003 Identical

⚠

A newer version of this standard is available.

View Current Edition
€263.42
Excluding VAT