BS EN 12953-6:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Shell boilers Requirements for equipment for the boiler
Hardcopy , PDF
English
30-04-2011
24-12-2024
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 General requirements for steam boilers and hot water boilers
5 Special requirements for steam boilers
6 Special requirements for hot water boilers
7 Operational aspects including maintenance and testing
8 Alarms and monitoring from the boiler plant
Annex A (informative) - Examples of steam and hot water boiler
systems
Annex B (normative) - Dimensioning of expansion space
Annex C (informative) - Aspects of boiler operation
Annex D (informative) - Drain and blowdown devices
Annex E (informative) - Alarms and monitoring from the boiler
plant
Annex F (informative) - Significant technical changes between
this European Standard and the previous edition
Annex ZA (informative) - Relationship between this European
Standard and the Essential Requirements of EU Directive
97/23/EC
Bibliography
Defines the minimum requirements for safety related equipment for shell boilers as defined in EN 12953-1, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be interrupted and locked out without manual (human) intervention at the boiler.
| Committee |
PVE/2
|
| DevelopmentNote |
Partially supersedes BS 2790(1992) Supersedes 97/720131 DC (07/2002) Supersedes 08/30190311 DC. (04/2011)
|
| DocumentType |
Standard
|
| ISBN |
9780580646188
|
| Pages |
56
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
This part of this European Standard specifies the minimum requirements for safety related equipment for shell boilers as defined in EN12953-1, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be interrupted and locked out without manual (human) intervention at the boiler.
NOTE1 The maximum time of operation without manual (human) intervention should be defined for each boiler system.
NOTE2 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 72 hours.
| Standards | Relationship |
| NF EN 12953-6 : 2011 | Identical |
| NS EN 12953-6 : 2011 | Identical |
| NBN EN 12953-6 : 2011 | Identical |
| I.S. EN 12953-6:2011 | Identical |
| NEN EN 12953-6 : 2011 | Identical |
| DIN EN 12953-6:2011-05 | Identical |
| EN 12953-6:2011 | Identical |
| UNE-EN 12953-6:2012 | Identical |