Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions, symbols and abbreviations
3.1 Terms and definitions
3.2 Symbols and abbreviations
4 Pipes at the "M" stage
4.1 Materials
4.2 General characteristics
4.3 Material characteristics
4.4 Geometric characteristics
4.5 Mechanical characteristics
4.6 Physical characteristics
4.7 Jointing
4.8 Marking
5 Fittings at the "M" stage
5.1 Materials
5.2 General characteristics
5.3 Material characteristics
5.4 Geometric characteristics
5.5 Mechanical characteristics
5.6 Physical characteristics
5.7 Jointing
5.8 Marking
6 Ancillary components
7 Fitness for purpose of the installed lining system
at the "I" stage
7.1 Materials
7.2 General characteristics
7.3 Material characteristics
7.4 Geometric characteristics
7.5 Mechanical characteristics
7.6 Physical characteristics
7.7 Additional characteristics
7.8 Sampling
8 Installation practice
8.1 Preparatory work
8.2 Storage, handling and transport of pipe and fittings
8.3 Equipment
8.4 Installation
8.5 Process-related inspection and testing
8.6 Lining termination
8.7 Reconnecting to existing manholes and laterals
8.8 Final inspection and testing
8.9 Documentation
Annex A (informative) Recommended scheme for assessment of
conformity
A.1 Scope
A.2 General
A.3 Testing and inspection
Bibliography