• Shopping Cart
    There are no items in your cart

BS EN 50518-2:2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Monitoring and alarm receiving centre Technical requirements

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

30-09-2014

Superseded date

22-08-2019

Superseded by

BS EN 50518:2019

€365.60
Excluding VAT
Summarise this standard

Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
7 Testing
8 Data
9 Data storage
10 Availability and verification of performance of the ARC
11 Contingency plan
Annex A (normative) - ARC availability calculations
Bibliography

Defines the technical requirements of an ARC and also includes functional performance criteria and verification of performance.

Committee
GW/1/11
DevelopmentNote
Supersedes 08/30183528 DC. (10/2011) Together with BS 8591(2014), BS EN 50518-1 & BS EN 50518-3 it Supersedes BS 5979(2007). (05/2014)
DocumentType
Standard
Pages
18
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

This part of EN50518 specifies the technical requirements of an ARC. This also includes functional performance criteria and verification of performance.

Standards Relationship
EN 50518-2:2013 Identical
I.S. EN 50518-2:2013 Equivalent

⚠

A newer version of this standard is available.

View Current Edition
€365.60
Excluding VAT